An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ministry of Public Works, Transport and Telecommunications VIENNA ECONOMIC FORUM TIRANA 09 June, 2008

  2. Current Situation Road sector • Durres – Kukes – Morine Prishtine - Nish • Corridor VIII Bari, Brindisi - Durres, Vlore –Tirane – Sofje – Burgas, Varna • North – Central – South Hani i Hotit – Shkoder – Gjirokaster – Kakavije Main: 177 km Main: 260 km Branch: 96 km Main: 405 km Branch: 72 km

  3. Road Infrastructure projects(Implementation) Durres – Morine Route 7 Corridor VIII North –South Corridor

  4. Road Infrastructure projects(Perspective)

  5. Railway Transport --- Operational lines --- Missing line • Length of main line 423 km • Length of secondary line 150 km • Border Station BAJZA • Terminal Stations Pogradec,Vlore • Maximum gradient 18 ‰ • Gauge 1435 mm

  6. Current situation Maritime sector • Port of Shengjini • Port of Durres (Porto Romano LPG+ Oil) • Port of Vlora (Petrolifera LPG + Oil) • Port of Saranda

  7. Maritime Transport

  8. Financed projects Port of Durres

  9. Implementation of Master plan of Vlora, cost of Master plan 31 mil € 15,3 mil € financed by Italian Cooperation: Construction of ferry terminal Construction of cargo peer Construction of port superstructure Financed projects Port of Vlora

  10. Construction of passenger’s terminal – financed by WB Construction of ferry terminal – financed by WB (design phase) Rehabilitation and extension of Limioni cargo wharf financed by GoA Financed projects Port of Saranda

  11. Passenger’s terminal - financed by GoA Construction of west breakwater – financed by GoA Construction of south breakwater – financed by GoA Dredging works – financed by GoA Financed projects Port of Shengjini

  12. Air Transport • “Mother Tereza” Succesful PPP model BOOT • Airport of Kukes 14 mil $ • NAMP Project 50 mil $ • Saranda Airport concession “Mother Tereza” Airport Kukes Airport

  13. Transport concession • New Port in Durres • Cement Terminal in Shengjin • Container’s Terminal in Durres Port • Container’s terminal in Vlora Port • Tourist Ports • Vehicles technical control centre

  14. Transport Concession • Thumane – Rrogozhine 66km 2x3.75m • Tirane – Durres upgrade of the existing road 29km 2x3x3.75m ≈100mil € • Tirane – Elbasan (1 Tunnel 2,4 Km) 30km 2X3.75m ≈160mil € • Tirane-Diber ( Arber Road) 70km 2x3.75 ≈ 160mil€

  15. Telecommunication Liberalized Market Fixed telephony: Albtelecom sh.a. privatized on 2007 – National operator of Fix telephone 66 alternative operators Mobile telephony: Albanian Mobile Communications – since August 2000; Vodafone Albania – since 2001 Eagle Mobile part of the privatization package of Albtelecom March 2008 Internet and added value services: 32 Internet service provider 30 Service provider for added value service, prepaid card etc

  16. Telecommunication perspective • New Law for electronic communications • Will liberalize the market • Licensing of WiMax operator • Licensing of the 4th Mobile operator • 3G technology

  17. THANK YOU !