1 / 3

Specfications and Scope

Contact 713-802-9654 www.axfordconsulting.com. GE LM6000PA Turbine Genset 60hz- 40 mw ISO. Specfications and Scope. In Service -Greeley, CO until June 2011 Lifetime fired hrs Since New 95,978 Fired Hrs Since Overhaul   44,434 Fired Hrs Since Hot Section  ~12,700

Download Presentation

Specfications and Scope

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Contact 713-802-9654 www.axfordconsulting.com GE LM6000PA Turbine Genset 60hz- 40 mw ISO Specfications and Scope • In Service -Greeley, CO until June 2011 • Lifetime fired hrsSince New 95,978 • Fired HrsSince Overhaul   44,434 • Fired Hrs Since Hot Section  ~12,700 • Fired Hrs Since LPT Replaced~4,500 • Lifetime Starts627 • Mfg by Stewart & Stevenson 1995 • Heat rate at site 9800 btu/kwh (hhv) • Evap Cooling with anti-ice coil • Woodward Controls, nat gas fuel sys • Air Cooled Brush gen 13.8 kv, 70 mva • 25 ppm NOx via steam inj

  2. GE LM6000PA Turbine Genset 60hz- 40 mw ISO Specfications and Scope • In Service -Greeley, CO until June 2011 • Lifetime fired hrsSince New 95,978 • Fired HrsSince Overhaul   44,434 • Fired Hrs Since Hot Section  ~12,700 • Fired Hrs Since LPT Replaced~4,500 • Lifetime Starts627 • Mfg by Stewart & Stevenson 1995 • Heat rate at site 9800 btu/kwh (hhv) • Evap Cooling with anti-ice coil • Woodward Controls, nat gas fuel sys • Air Cooled Brush gen 13.8 kv, 70 mva • 25 ppm NOx via steam inj Contact Ed Stewart 713-572-9713 estewart@axfordconsulting.com

  3. GE LM6000PA Turbine Genset 60hz- 40 mw ISO Specfications and Scope • In Service -Greeley, CO until June 2011 • Lifetime fired hrsSince New 95,978 • Fired HrsSince Overhaul   44,434 • Fired Hrs Since Hot Section  ~12,700 • Fired Hrs Since LPT Replaced~4,500 • Lifetime Starts627 • Mfg by Stewart & Stevenson 1995 • Heat rate at site 9800 btu/kwh (hhv) • Evap Cooling with anti-ice coil • Woodward Controls, nat gas fuel sys • Air Cooled Brush gen 13.8 kv, 70 mva • 25 ppm NOx via steam inj Contact Rob McNamee 668-393-9702 rmcnamee@axfordconsulting.com

More Related