310 likes | 570 Views
ISQA 479. Warehouse Locations International Issues. Vale Brasil. VALE BRASIL.
E N D
ISQA 479 Warehouse Locations International Issues
VALE BRASIL Flag SINGAPOREDWT 400,000 tonnesSpeed (knots) 14.8Draught (m) 23.00 (75.46 ft)Depth Moulded (m) 30.40 (99.74 ft)Breadth (m) 65.00 (213.25 ft)Length 362.00 (1,187.66 ft) (LO)Engine MAN-B&W 7S80ME-C8Power 27,162 (Kw) For Distribution of Iron Ore to China
Distribution Strategies • Customer Locations • Supplier Locations • Numbers of DCs • DC Locations • Inventory Strategy • What to Stock • How Much • At Which Locations • Transportation Strategies
Warehouse Locations • 1 Warehouse: Henderson KY 2.28803 • 2: Ashland KY; Bakersfield CA 1.48487 • 3: Allentown PA; McKenzie TN; Bakersfield CA 1.29378 • 4: Lancaster PA; Meridian MS; Chicago IL; Bakersfield CA 1.20316 • 5: Summit NJ; Dallas TX; Macon GA; Chicago IL; Bakersfield CA 1.13264 • 6: Summit NJ; Dallas TX; Macon GA; Pasadena, CA; Chicago IL; Tacoma WA 1.08236 • Yellow: Days in Transit Green: Miles
Warehouse Locations • 7: Summit; Chicago; Tacoma; Gainesville; Dallas; Lakeland, FL; Pasadena 1.07216 • 8: 7 Plus Denver CO 1.05200 • 9: Summit; Chicago; Alhambra CA; Gainesville; Dallas; Tacoma; Lakeland; Denver, Oakland CA 1.04187 • 10: Newark NJ; Rockford IL; Alhambra CA; Mansfield OH; Gainesville GA; Palestine TX; Tacoma WA; Lakeland FL; Denver CO; Oakland CA 1.04173
Containerized Container Acquisition Inland Wharfage and Handling Loading Transit Wharfage and Handling Inland Final Delivery Bulk Ship Charter Inland Transport Bulk Loading Facility Stow and Trim Transit Bulk Unloading Terminal Inland Transport Final Delivery International Transport Issues
International Issues • Documentation • Certificates of Origin • Export Permits and Documentation • Inspection Certificates • Import Documents • Duties and Tariffs • Health/Pest Inspections and Certificates • Others
International Issues • Payment • Up Front • On Account • Letters of Credit • Irrevocable • Confirmed • Standby
Goals of Supply Chain Management • Quality • Time • Reliability • Flexibility • Cost
Supply Chain Risks • Social and Religious Conflict • Terrorism • Natural Resource Dependency • Natural Resource Depletion • Supply Chain Uncertainty • External vs Internal Risks
Correct Transaction Cost Total trans. cost Cos t s Logistical cost Material cost Admin cost Transaction origin Transaction conclusion Time
Typical Measured Costs • Material Cost • Service Cost • Administrative Cost • PO Cost • Receiving • Accounts Payable • Freight
Back Orders Late Deliveries Defective Material Costs Costs of Rejected Goods Prod’n Stop Costs Project Delay Costs Air Freight Cost of Warranty Failures Extra Inventory Cost Services Incorrectly Performed Invoice Errors Highly Variable Lead Times Freight Damage Costs Typically Not Measured
Time delay Invoice errors Cost overrun Freight damage Cos t s Total trans. cost Raw material delays Specification questions from supplier Transaction origin Time Expected transaction Actual conclusion
Additional Supply and Logistics Risks • Origin Risk Analysis • Natural Disasters • Labor Issues • Political Issues • Logistics Risk • Capacity • In-transit Loss or Damage • Labor Issues • Clearance Delays • Infrastructure Constraints
Additional Supply and Logistics Risks • Inventory Risk • Loss or Damage • Obsolescence • Shrinkage • Technology Risk • Bad Selection Process • Lack of Training • Late Adoptor
Functional Issues Engineering Late Sr Mgmt Approval Poor Specifications Specifications Late Rush Orders Poor Forecasting and Planning Policy Issues Cheapest Supplier No Standardization No Supplier Visits Outsourcing Lean FOB Destination ERP Selection Internal Risks
Supplier Risks Late Shipment Quality Financial Failure Costs Logistical Risks Late Shipment Freight Damage Capacity Issues Infrastructure Costs Global Risks Global Economy Currency Fluctuation Political Instability Natural Disasters Raw Material Availability National Risks Inflation Retirements External Risks
Infrastructure Risks • Infrastructure Deteriorating Faster than Repair • Congestion at All Levels • Difficulty Locating Logistical Capacity • Increased Lead Times • Increased Inventories • Increased Costs • Increased Supply Chain Uncertainty and Risk • Losing Ground to Other Countries
Risk Management • Identify Risk • Assess Probability • Devise Strategies • Proactive • Reactive • How to Eliminate High Probability/Low Cost Events
Avoiding Extra Cost Risk • Good Specifications and Statements of Work • Quality Control and Monitoring • Rule of 10 • Expediting • On Time Delivery • Logistics Management • Freight Damage • Correct Delivery • Holding Suppliers Accountable
Impacts of Supplier Failures • Air Freight Study • 50% is from Supplier Failures • Construction Project Study • From 16 to 23 Percent of ENTIRE Project Costs Attributed to Quality Failures • Increasing Focus on Supplier Accountability
Risk Management • Global Supply Chains Increase Risk • Continuity (Risk) Planning • Suppliers’ Plans • Carriers • Geographic Dispersion of Suppliers • Emergency Inventory
Risk Management • Good Forecasting • Intense Market Study • Careful Supplier Selection • Superior Supplier and Carrier Communication • Problem Prevention Plans • Comparison to Disaster Planning
Risk Management • Disaster Planning • Natural Disasters • Supplier Failures • Financial • Labor Interruptions • Supply Chain Risks • Security • Conformance • Supplier Environmental and Social Responsibility