100 likes | 118 Views
Environmental Protection Division. Conservation Area Impact Permit Gary and Karen Nelson and Dennis Hightower District 4. June 9, 2009. Location Map. Aerial of Subject Site. Aerial of Subject Site with NHWE. Approximation of NHWE. Lot 27. Lot 26. Lake Mary Jane. Photo of Subject Site.
E N D
Environmental Protection Division Conservation Area Impact PermitGary and Karen Nelson andDennis HightowerDistrict 4 June 9, 2009
Aerial of Subject Site with NHWE Approximation of NHWE Lot 27 Lot 26 Lake Mary Jane
Site Plan Submitted Lot 26 Lot 27
Conditions • The wetland impacts shall be minimized the greatest extent possible. This shall be accomplished by connecting proposed garage to the west side of the residence, locating the driveway only on parcel 23-24-31-4660-00-260 and construction of a retaining wall around the fill area. • Prior to initiating any construction within the wetlands to be impacted EPD must receive a letter of verification from TM-Econ Mitigation Bank, or other appropriate mitigation bank approved by EPD, stating that the transaction regarding the transfer of 1.08 mitigation credits has been completed. • In the event that the permittee does not successfully complete the transaction to obtain 1.08 credits from an approved mitigation bank, the permittee shall obtain a permit modification to provide alternative mitigation for the wetland impacts prior to commencement of construction activities.
Action Requested • ACTION REQUESTED: • Approval of the Conservation Area Impact Permit Application, subject to the revisions of the site plan, purchase of the additional 0.50 credits from the appropriate mitigation bank and the 28 conditions.
Environmental Protection Division 800 Mercy Drive Orlando, Florida 32808 407.836.1400 FAX 407.836.1499