Receiver Status Update. MWA Project Meeting December 7 th 2011. Node 10’s first visit to MRO. Node 10 at the MRO on X15 Environmental protection Refrigeration system RF Shielding Ease of access and repair. A visit from the local residents. Major components include:
E N D
Receiver Status Update MWA Project Meeting December 7th 2011
Node 10’s first visit to MRO Node 10 at the MRO on X15 Environmental protection Refrigeration system RF Shielding Ease of access and repair Master Title
Major components include: Refrigeration Unit, DOCx Cards, ATIM-T Cards, Refrigeration Control unit, Receiver Crate
Same SBC as Node 10 Mechanical Temperature Failsafe Lexan covered for easy identification Some trade-offs in design
Clock Board design is not as robust as I would like. Possible 6 nSec Jitter on SCTN arming.
Should be 20dB below MIL-STD 461 Must be “Good Neighbor” to ASKAP Problem with Orbcomm transmissions?
Refrigeration failures on X15 & X16 New unit but needs testing
Documentation is coming along. Never detailed enough
First Receiver arrives 27th Feb 2012 for testing. 2nd April delivery for use.