210 likes | 698 Views
ENERGY CONSERVATION. ENERGY MANAGEMENT SYSTEM. M.S.E.B. BILL MANAGMENT. ENERGY CONSUMPTION ANALYSIS / BENCH MARKING. Energy conservation projects. ENERGY CONSERVATION. M.S.E.B bill. Energy consumption analysis. Energy Management system. Power Factor.
E N D
ENERGY CONSERVATION ENERGY MANAGEMENT SYSTEM M.S.E.B. BILL MANAGMENT ENERGY CONSUMPTION ANALYSIS / BENCH MARKING Energy conservation projects.
ENERGY CONSERVATION M.S.E.B bill Energy consumption analysis Energy Management system Power Factor Real time measurement of consumption of Electric power P.V.C. H.D.P.E. P.P.R. Rs./unit Extrusion division Compressed air system M.S.E.B. T.O.D. Tariff Utility Mixer division Chilled water system Maximum Demand Socketing division Vacuum system Load Factor Grinder/ Pulvariser Others Demand Management Cumulative P.V.C.
Energy Management System 132 kv MD Controller Energy Management System (E.M.S.) PVC Pipe (11 kv) HDPE/PPR (11kv) C & P (11kv) LTPCC LTPCC LTPCC Extruder Grinder Utility PVC CPVC ROTO HMF Canteen Statistical Analysis Extruder Mixer Grinder/ Pulveriser Objective :- Energy conservation Extruder Mixer Socketing Grinder/ Pulveriser Utility Capacitors Spares
Energy Management Report Daily Power Consumption
ENERGY CONSUMPTION FOR THREE YEAR PPRC C/P HDPE CPVC UPVC
Salient features • As policy, we have decided that we will buy efficiency 1 motor with all new machinery. • we will be replacing the existing motors with efficiency 1 motors at opportune times. • We have introduced conditioning chemicals for water treatment. The parameters like STD, COC and LSI are being continuously monitored. This has resulted in drastically reducing the frequency of acid descaling of heat exchangers. The better heat transfer at heat exchangers of chillers has resulted in achieving optimum SPC of chillers. • Waghur river water lifting pumping station is run on MSEB power supply as far as possible despite the fact that power feeder is a rural one having very high load shedding cycles. this has resulted in minimum use of D.G. power & hence substantial saving in power cost. • Solar lighting was provided at truck terminus. The performance is being assessed for wider applications.
Source :-Values Of Performance Characteristic Of 4 Pole Energy Efficient Induction Motors IEEMA – 19 - 2000