1 / 18

ENERGY CONSERVATION

ENERGY CONSERVATION. ENERGY MANAGEMENT SYSTEM. M.S.E.B. BILL MANAGMENT. ENERGY CONSUMPTION ANALYSIS / BENCH MARKING. Energy conservation projects. ENERGY CONSERVATION. M.S.E.B bill. Energy consumption analysis. Energy Management system. Power Factor.

shadow
Download Presentation

ENERGY CONSERVATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENERGY CONSERVATION ENERGY MANAGEMENT SYSTEM M.S.E.B. BILL MANAGMENT ENERGY CONSUMPTION ANALYSIS / BENCH MARKING Energy conservation projects.

  2. ENERGY CONSERVATION M.S.E.B bill Energy consumption analysis Energy Management system Power Factor Real time measurement of consumption of Electric power P.V.C. H.D.P.E. P.P.R. Rs./unit Extrusion division Compressed air system M.S.E.B. T.O.D. Tariff Utility Mixer division Chilled water system Maximum Demand Socketing division Vacuum system Load Factor Grinder/ Pulvariser Others Demand Management Cumulative P.V.C.

  3. Energy Management System

  4. Energy Management System 132 kv MD Controller Energy Management System (E.M.S.) PVC Pipe (11 kv) HDPE/PPR (11kv) C & P (11kv) LTPCC LTPCC LTPCC Extruder Grinder Utility PVC CPVC ROTO HMF Canteen Statistical Analysis Extruder Mixer Grinder/ Pulveriser Objective :- Energy conservation Extruder Mixer Socketing Grinder/ Pulveriser Utility Capacitors Spares

  5. Energy Management Report Daily Power Consumption

  6. Energy Management Report

  7. Energy Management Report

  8. Energy Management Report

  9. ENERGY CONSUMPTION FOR THREE YEAR PPRC C/P HDPE CPVC UPVC

  10. Salient features • As policy, we have decided that we will buy efficiency 1 motor with all new machinery. • we will be replacing the existing motors with efficiency 1 motors at opportune times. • We have introduced conditioning chemicals for water treatment. The parameters like STD, COC and LSI are being continuously monitored. This has resulted in drastically reducing the frequency of acid descaling of heat exchangers. The better heat transfer at heat exchangers of chillers has resulted in achieving optimum SPC of chillers. • Waghur river water lifting pumping station is run on MSEB power supply as far as possible despite the fact that power feeder is a rural one having very high load shedding cycles. this has resulted in minimum use of D.G. power & hence substantial saving in power cost. • Solar lighting was provided at truck terminus. The performance is being assessed for wider applications.

  11. Source :-Values Of Performance Characteristic Of 4 Pole Energy Efficient Induction Motors IEEMA – 19 - 2000

  12. Thank you

More Related