1 / 9

Jason Aughenbaugh gtg224k@mail.gatech Advised by Dr. Chris Paredis

Mathematical Formalisms for Handling Uncertainty in Engineering Design. Jason Aughenbaugh gtg224k@mail.gatech.edu Advised by Dr. Chris Paredis Systems Realization Laboratory. Manufacturing in 2020. Product marketplace Global markets for products Global competition

shana
Download Presentation

Jason Aughenbaugh gtg224k@mail.gatech Advised by Dr. Chris Paredis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mathematical Formalisms for Handling Uncertainty in Engineering Design Jason Aughenbaugh gtg224k@mail.gatech.edu Advised by Dr. Chris Paredis Systems Realization Laboratory

  2. Manufacturing in 2020 • Product marketplace • Global markets for products • Global competition • Consumers with rapidly evolving demands • Technology • Computer speed, power, portability • Increased knowledge management • More powerful modeling • Product Systems • Complex and multidisciplinary • Need to identify and shape demands

  3. Knowledge in a manufacturing enterprise • Manage employee knowledge • Get knowledge to engineers • Unlock the knowledge in the workforce • Provide means to communicate knowledge • Encourage others to listen and learn • Product lifecycle management (PLM) • Structural capital to support the intellectual capital • Often emphasizes individual tools • Interactions between pieces are important

  4. Systems Design for 2020 Systems Engineering • Recognizes both the product system and human system • A holistic, hierarchical approach to decomposition, integration, verification, and validation • Limitations: decisions are • Coupled • Made under uncertainty Vee model Forsberg and Mooz (1992) "The Relationship of Systems Engineering to the Project Cycle," Engineering Management Journal, 4(3), pp. 36-43.

  5. Uncertainty in Design Decisions • Aleatory Uncertainty: stochastic • Inherent randomness exists • Probability Distributions apply • Epistemic uncertainty: lack of knowledge • Not random • Intervals may apply • Arises in engineering design • System requirements • System environment • Future decisions • Emergent attributes

  6. Possible Formalizations of Uncertainty • Probability theory: frequentist or subjective • Dempster-Shafer/Evidence theory • Possibility theory • Interval computations • Probability bounds analysis • A novel theory or combination of theories Bel(A) = 0.4 Pl(A) = 0.8 … ? [lower, upper]

  7. Leveraging knowledge and models • Represent uncertainty • How good are the results or estimates? • Formalize model context • When does this model have stated uncertainty? • Integrate models • Use and reuse models together

  8. Computations involving uncertainty Formal Representation Of Uncertainty Formal Theory Formal Interpretation Of Output Desired: In engineering design, probability is usually used to model uncertainty: Objective Probability Distribution Probability Theory Objective Interpretation Of Output Acceptable: Subjective Probability Distribution Probability Theory Subjective Interpretation Of Output Acceptable: Unfortunately, the following is often done: Subjective Probability Distribution Probability Theory Objective Interpretation Of Output Unacceptable:

  9. Probability Bounds Analysis (P-boxes) • An enveloping of all possible CDFs • It represents aleatory uncertainty (variability) via the cumulative probabilitydistributions • It represents epistemic uncertainty (incertitude) via the interval on the parameters • Example p-boxes • Example 1 • N([0,1],1): Normal distribution • mean in the interval [0,1] • variance 1 • Example 2 • Minimum = 0 • Maximum = 100 • Mean = 50 Example 1 Example 2