1 / 21

The EDMVS’ Draft Work Plan

The EDMVS’ Draft Work Plan. Presentation to the EDMVS, December 10, 2003. Purpose of Today’s WorkPlan. Show progress of EDSP Provide the status of each assay Project what’s next. Tier I Screening Battery recommended for consideration by EDSTAC. Steroidogenesis Pubertal - female

shana
Download Presentation

The EDMVS’ Draft Work Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The EDMVS’Draft Work Plan Presentation to the EDMVS, December 10, 2003

  2. Purpose of Today’s WorkPlan • Show progress of EDSP • Provide the status of each assay • Project what’s next

  3. Tier I Screening Battery recommended for consideration by EDSTAC • Steroidogenesis • Pubertal - female • Fish Screen aka short term fish reproduction • Amphibian Metamorphosis • Estrogen / Androgen receptor binding • Hershberger • Uterotrophic

  4. Alternative Assaysrecommended for consideration by EDSTAC Tier I • Aromatase • Pubertal male • Adult 14 –day intact male Tier ? • In Utero through Lactation

  5. Tier II Assays recommended for consideration by EDSTAC • Mammalian 2-generation • Avian 2-gen. Reproduction • Amphibian Development and Repro. • Invertebrate (Mysid) Lifecycle • Fish Lifecycle

  6. Tier I Assays

  7. Steroidogenesis Milestone Current Status • DRP/Protocol  June 02 -cell based (H295R) Dev by ORD • Prevalidation -sectional testes optimization June & Aug 03 -multichem & interlab In Lab -cell based (H295R) In Lab • Validation -inter-lab to lab June 04 Current Status = dates presented to EDMVS & other information

  8. Milestone DRP equivalent Prevalidation -Single Dose Study -Multi-chemical & multi-dose Protocols -Multi-chemical & multi-dose -Restricted Feeding Study Validation (inter-lab) Current Status  Dec 01  Dec 01  Dec 01 Today  July 02 To lab Feb 04 Pubertals – m&f

  9. MilestonesCurrent Status DRP/Protocol  Mar 02 Prevalidation - FHM  Mar 02 - FHM w/multi-chemicals Report writing - Comparative Study Plans:  Mar 02 -Results: Comparative Studies Vitellogenin Methods, FHM assays  Aug 03 Validation (inter-lab) depends on OECDPhase 1A (OECD)  Aug 03 Phase 1B (OECD) Spring 04 Fish Screen

  10. Amphibian Metamorphosis MilestoneCurrent Status • DRP/Protocol  July 02 • Pre-validation prometamorphosis - optimize protocol (US) Spring 04 -protocol demonstration to lab • Validation (inter-lab OECD) TBD -Phase I (protocol optimization) Spring 04 -”Phase 2” PlanSpring 04

  11. ER / AR binding ICCVAM • Scientific Expert Panel’s May 2002 retrospective validation • EDMVS briefed by ICCVAM July 2002 • Expert Panel Final Report Sept 2002 • ICCVAM Final Report May 2003 • EDSP: AR in lab (preval) Update Today • EDSP: ER in lab (valid) Oct 02- Oct 04

  12. Aromatase Milestones Current Status • DRP / Protocol  Mar 02 • Prevalidation -placental microsomal assay  June 03 compare bovine, human, porcine uterine tissue -comparison: human placental & recombinant, multi chem Today • Validation (inter-lab) to lab Jan 04

  13. In Utero Lactation MilestoneCurrent Status • DRP Dec 02 -Protocol review Mar 02 • Prevalidation -Protocol Demo Data Analysis -Multi-chem study TBD • Validation (inter-lab) TBD

  14. Tier II Assays

  15. Mammalian 2-generation Milestone Current Status • Prevalidation One-gen. Ext. Protocol  Dec 02 Propylthiouracil Study  July 02 One-gen Ext. study  June 03 • Validation (inter-lab) TBD

  16. Avian 2-gen. Reproduction MilestoneCurrent Status • DRP/Protocol  Aug 03 • Prevalidation - Avian Dosing Study Plan  Mar 02 - Avian species Comparison Report writing -Avian Dose Study In Lab -Protocol demo future • Validation (inter-lab OECD) future

  17. Amphibian Dev. & Repro. Milestones Current Status • DRP/Protocol Spring 04 • Prevalidation -transferable protocol future -multi-chem study future • Validation (inter-lab) future

  18. Mysid Lifecycle Milestones Current Status • DRP/Protocol  July 02 • Prevalidation -transferable protocol Spring 04 -multi-chem study future • Validation (inter-lab OECD) future

  19. Fish Lifecycle Milestones Current Status • DRP/Protocol  Dec02 • Prevalidation -protocol demo In Lab -multi-chem study future • Validation (inter-lab OECD) future

  20. Spring/Summer 2004 • Amphibian DRP (Tier II) • Amphibian Screen protocol (Tier I) • Fish Screen multi-chemical results • Fish Screen Phase 1B (OECD) • Mysid Transferable Protocol • In Utero Through Lactation • Avian Species Comparison Results

  21. EPA Docketwww.epa.gov/edocketJune 03 OPPT-2003-0016August 03 OPPT-2003-0027Dec 03 OPPT-2003-0064 EDSP website www.epa.gov/scipoly/oscpendo

More Related