The EDMVS’ Draft Work Plan. Presentation to the EDMVS, December 10, 2003. Purpose of Today’s WorkPlan. Show progress of EDSP Provide the status of each assay Project what’s next. Tier I Screening Battery recommended for consideration by EDSTAC. Steroidogenesis Pubertal - female
E N D
The EDMVS’Draft Work Plan Presentation to the EDMVS, December 10, 2003
Purpose of Today’s WorkPlan • Show progress of EDSP • Provide the status of each assay • Project what’s next
Tier I Screening Battery recommended for consideration by EDSTAC • Steroidogenesis • Pubertal - female • Fish Screen aka short term fish reproduction • Amphibian Metamorphosis • Estrogen / Androgen receptor binding • Hershberger • Uterotrophic
Alternative Assaysrecommended for consideration by EDSTAC Tier I • Aromatase • Pubertal male • Adult 14 –day intact male Tier ? • In Utero through Lactation
Tier II Assays recommended for consideration by EDSTAC • Mammalian 2-generation • Avian 2-gen. Reproduction • Amphibian Development and Repro. • Invertebrate (Mysid) Lifecycle • Fish Lifecycle
Steroidogenesis Milestone Current Status • DRP/Protocol June 02 -cell based (H295R) Dev by ORD • Prevalidation -sectional testes optimization June & Aug 03 -multichem & interlab In Lab -cell based (H295R) In Lab • Validation -inter-lab to lab June 04 Current Status = dates presented to EDMVS & other information
Milestone DRP equivalent Prevalidation -Single Dose Study -Multi-chemical & multi-dose Protocols -Multi-chemical & multi-dose -Restricted Feeding Study Validation (inter-lab) Current Status Dec 01 Dec 01 Dec 01 Today July 02 To lab Feb 04 Pubertals – m&f
MilestonesCurrent Status DRP/Protocol Mar 02 Prevalidation - FHM Mar 02 - FHM w/multi-chemicals Report writing - Comparative Study Plans: Mar 02 -Results: Comparative Studies Vitellogenin Methods, FHM assays Aug 03 Validation (inter-lab) depends on OECDPhase 1A (OECD) Aug 03 Phase 1B (OECD) Spring 04 Fish Screen
Amphibian Metamorphosis MilestoneCurrent Status • DRP/Protocol July 02 • Pre-validation prometamorphosis - optimize protocol (US) Spring 04 -protocol demonstration to lab • Validation (inter-lab OECD) TBD -Phase I (protocol optimization) Spring 04 -”Phase 2” PlanSpring 04
ER / AR binding ICCVAM • Scientific Expert Panel’s May 2002 retrospective validation • EDMVS briefed by ICCVAM July 2002 • Expert Panel Final Report Sept 2002 • ICCVAM Final Report May 2003 • EDSP: AR in lab (preval) Update Today • EDSP: ER in lab (valid) Oct 02- Oct 04
Aromatase Milestones Current Status • DRP / Protocol Mar 02 • Prevalidation -placental microsomal assay June 03 compare bovine, human, porcine uterine tissue -comparison: human placental & recombinant, multi chem Today • Validation (inter-lab) to lab Jan 04
In Utero Lactation MilestoneCurrent Status • DRP Dec 02 -Protocol review Mar 02 • Prevalidation -Protocol Demo Data Analysis -Multi-chem study TBD • Validation (inter-lab) TBD
Mammalian 2-generation Milestone Current Status • Prevalidation One-gen. Ext. Protocol Dec 02 Propylthiouracil Study July 02 One-gen Ext. study June 03 • Validation (inter-lab) TBD
Avian 2-gen. Reproduction MilestoneCurrent Status • DRP/Protocol Aug 03 • Prevalidation - Avian Dosing Study Plan Mar 02 - Avian species Comparison Report writing -Avian Dose Study In Lab -Protocol demo future • Validation (inter-lab OECD) future
Amphibian Dev. & Repro. Milestones Current Status • DRP/Protocol Spring 04 • Prevalidation -transferable protocol future -multi-chem study future • Validation (inter-lab) future
Mysid Lifecycle Milestones Current Status • DRP/Protocol July 02 • Prevalidation -transferable protocol Spring 04 -multi-chem study future • Validation (inter-lab OECD) future
Fish Lifecycle Milestones Current Status • DRP/Protocol Dec02 • Prevalidation -protocol demo In Lab -multi-chem study future • Validation (inter-lab OECD) future
Spring/Summer 2004 • Amphibian DRP (Tier II) • Amphibian Screen protocol (Tier I) • Fish Screen multi-chemical results • Fish Screen Phase 1B (OECD) • Mysid Transferable Protocol • In Utero Through Lactation • Avian Species Comparison Results
EPA Docketwww.epa.gov/edocketJune 03 OPPT-2003-0016August 03 OPPT-2003-0027Dec 03 OPPT-2003-0064 EDSP website www.epa.gov/scipoly/oscpendo