1 / 1

Materiel Solution Analysis (MSA) Phase

MDD. MS A. Materiel Solution Analysis (MSA) Phase. ASR. FCB Review. Conduct AoA. Documents: Draft CDD RFP TDS SEP (including RAM-C Report) TES AoA Report PPP (including IA strategy) LCSP CCE. Final AoA SAG/ESC.

shania
Download Presentation

Materiel Solution Analysis (MSA) Phase

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MDD MS A Materiel Solution Analysis (MSA) Phase ASR FCB Review Conduct AoA • Documents: • Draft CDD • RFP • TDS • SEP (including • RAM-C Report) • TES • AoA Report • PPP (including IA • strategy) • LCSP • CCE Final AoA SAG/ESC Perform Analysis to Support Selection of a Preferred Materiel Solution Service Recommended Preferred Materiel Solution Perform Operational Analysis on Preferred Materiel Solution Perform Technical/Engineering Analysis on Preferred Materiel Solution Establish Program Framework and Strategies Prepare for Initial Review Milestone and Next Phase

More Related