An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presents

  2. Break through of Eco-Green washing process In Industrial Laundries

  3. Intellectual property Aqua Solutions filed an IP application for “Apparatus and method for laundering” with the “World Intellectual Property Organization”

  4. Compliance * Reduced amount of total chemicals

  5. Amount of total chemicals * Current criteria for the amount of total chemicals shall not exceed 100 g/wash. * By using AS-System, the amount of total chemicals is reduced by 80%-90%.

  6. Amount of phosphates * Current criteria for the amount of phosphates (as STPP) in the product shall not exceed 25 g/wash. * By using AS-System, the amount of phosphates (as STPP) is 0% !!

  7. Compliance * Reduced amount of total chemicals * Increased biodegradability

  8. Increased biodegradability * Current ratio of B.O.D / C.O.D is 10% - 15% * By using AS-System, the Wastewater ratio : BOD/COD > 50%

  9. Report from Sofitel Athens Airport: SAMPLE #1 – Program Sheets Chemical Parameters Method Units Result Limits pH 4500-HB 9.9 6.0-9.0 B.O.D. 5210 D mgO2/L 264 <500 C.O.D. 5220 B mgO2/L 494 <1000 Suspended Solids 2540 D mg/L 51 <500 Ammonia 4500-NH3 D mgN/L 0 <25 Nitrate 4500-NO3 D mgN/L 0 <20 Phosphate 4500-P D mgP/L 0.1 <10 Biodegradability = BOD / COD = 264/494 = 53%

  10. Compliance * Reduced amount of total chemicals * Increased biodegradability * Reduced washing cycle time

  11. Reduced washing cycle time * Current washing cycle time is between 25 – 45 minutes. * By using AS-System, the washing cycle time is reduced by at least 20% for each laundry program.

  12. Compliance * Increased biodegradability * Increased biodegradability * Reduced washing cycle time * Less water consumption

  13. Less water consumption * Current washing cycle consume 18-20 liter of soft water for 1Kg. textiles * By using AS-System, the water consumption reduced by 40% - 50%

  14. Compliance * Reduced amount of total chemicals * Increased biodegradability * Reduced washing cycle time * Less water consumption * Less energy consumption

  15. Less energy consumption * Current washing stages consume heating energy for heating to 40°C – 85°C * By using AS-System, heating energy for the washing machines is reduced by 70% for the washing stage.

  16. Compliance * Reduced amount of total chemicals * Increased biodegradability * Reduced washing cycle time * Less water consumption * Less energy consumption * Extending fabric life

  17. Extending fabric life * Current criteria for Strength reduction (power reduction) for cotton fabric, 50 washing cycles : max 30% * By using AS-System, Strength reduction for the same : 10% - 13%

  18. Extending fabric life * Current criteria for deterioration reduction (chemical deterioration of fiber) for cotton fabric, 50 washing cycles : max 1.0 * By using AS-System, deterioration reduction for the same : 0.3 - 0.7

  19. Laundry costs savings

  20. System scheme

  21. Current sales * Israel: AS600 for pilot plant + AS200 X 2 systems in food sector * Italy : AS200 for pilot plant + AS400 X 2 systems in Rome * Greece: AS200 in Sofitel, Athens airport AS1000 for new in GMP Athens. AS200 X 2 systems in Neptune & Divan hotels, KOS island. * Turkey:AS200 installed as demonstration unit AS600 installed in “Civit”, industrial laundry, Alanya AS200 Buket, Anataliya * Palma de Majorca: AS400 - 1st. installed in Dec. 2007 additional AS400 - 2st. step to be installed in April 2008 * France: Sofitel Quiberon, AS-200 to be installed in Feb 2008