Procurement Steven Call Director of Strategic Sourcing December 5th, 2008
Strategic Sourcing Key Messages • Current Net Inflation – $ 0.6 m vs. $12.1 m at Fin Rev • Drastic swings over the past two months • Supply chain re-alignment underway • Past Moves – Atizapan & Cluj • Future Moves – East Granby, Columbus, Birch Hill • Fixing the supply chain – realign based on Total Cost • Key Performance Indicators • General Inflation Overview • Key Projects updates • DPO
FY09 Metal HedgesNon Ferrous $4.5M Favorable YOY Hedging Copper/HCS only in the future
Metals – Price recovery planWhat’s EGS doing to go after 2 Years of Metal Inflation?
Supplier Risk – Top 400 analyzed MAGNETEK HIGH Reviewed top 400 Suppliers Held risk reviews with Plants alerting them to warning signs Implemented contingency plans for top 5 suppliers Worked with Legal to develop a “tooling ownership” document Working on Tagging Method for hard tooling STRATINOR DC MEX BARTEC CASTWELL BOHEMIUM GLASS US STEEL SIGMA SUPPLY RISK SHANTOU Cust. Alloy LOW LOW HIGH FINANCIAL RISK
Supplier Risk Financial Distress spreading, could become Unmanageable
Supply Chain Regionalization Regionalization Strategy Plant Move Timeline
Future supply base Current supply base Supply Chain LocalizationATX Lighting → Cluj $500.00 $500.00 $30,000.00 $30,000.00 $900,000.00 $900,000.00 $21M USD in Total Spend 195 Suppliers 2499 SKU’s $8 M.. In process of Moving in FY09 $1 M Completed through December Key Successes - European Leadership - Supplier Cost Management - Key Supplier Review LeGrand / SAFT / Bartec Challenges - Stratinor - Bankruptcy - IBV – Transfer Qualifications
Supply Chain LocalizationATX → Cluj Plastic Parts/Castings the current focus
Supply Chain LocalizationEast Granby→Stephenville $6,398 in Spend 36% of Spend to move with Plant Rationalization Freight – No Impact
Supply Chain LocalizationEast Granby → Stephenville Strategy Historically HCS has not been managed by Rosemont To complete Supplier review in EG in 2Q
Supply Chain LocalizationCO Lighting → Mexico II $9,335 K in Spend 40% of Spend to move with Rationalization Inbound Freight impact should be minimal once supply base is realigned
Supply Chain LocalizationCO Lighting → Mexico II Strategy Die Casting the Pacing Commodity
Supply Chain LocalizationColumbus Powertite/Plugs & Receptacles → Atizapan $2,340 K in Spend 48% to be localized
Supply Chain LocalizationColumbus Powertite/Plugs & Rec. → Atizapan Strategy Fairly Easy Localization
Supply Chain LocalizationBirch Hill Assembly → Mexico II $2,640 K in Spend $683 K – Foundry Metals $203 K – Moved FY08 83% to complete moves
Supply Chain LocalizationBirch Hill Assembly → Mexico II Strategy Extremely High Mix / Low Volume – Difficult Move!
Supply Chain LocalizationTulsa → Houston $1,321 K in Spend $479 K in Installation $527 K Enclosure Assembly 43% to be Moved
Supply Chain LocalizationTulsa → Houston Tulsa “mfg” a logical fit with Houston
Supply Chain Optimization – Areamaster Asian Assembly / Columbus & Atizapan minor assembly Potential Savings $860K 27,000 / year Current Costs Duty - $335K Logistics - $238K Ballast - $756K Housing - $1,458K 124 part numbers combinations Only two base housings 10 P/N 80% Alternative Sourcing Strategies:(1) Current Strategy(2) NAFTA Manufacture(3) Hybrid – Base off shore / customize in Memphis
MMR Areamaster LightingRevisiting Sourcing Strategies on $5.5M Lighting Product $0.9M Potential – eSourcing 12/08
Supply Chain ASIA Buyouts – Supply Chain Lead Time Reduction • Dual Source China and India – Inventory Reduction • EMT Fittings lead time – 110 day to 45 days – Mar‘09 • Dual sourcing approved – to handle spikes • Dual Source LCC & US – Inventory Reduction • Buyout Stamped parts • Quoting – Either source in NA or flex supply in NA - Apr ‘09 • Sola – Sourcing Review • Component / part Lead Time Analysis by part – Feb ’09 • Identify and fix long lead time through BOM review • Kanban “A” items in Chinfa – Jan’09 • NA options - Transformer NA manufacture review to be completed – Feb ’09 • $9 Cost, $12 Price, $12 Air Ship Cost
Supply Chain – Tooling Projects Fixing the tooling issues!
Summary • Have assembled High Caliber Team • Supplier Bankruptcies could cripple EGS • Taking maximum advantage of Plummeting Commodities • Working with Operations on all Line moves • Balancing Strategic with Tactical appropriately • Will eliminate 300 Suppliers • Plan drives sharp reduction in Supply Chain complexity
Central Planning Dan Goodman Director, Planning December 5, 2008
Objectives Customer Service Make to Order Make to Stock Inventory Management Align stock levels with demand Priorities Analysis Upgrading the Organization BCC Training and expansion Tools Pull System – Kanban Budgeting Inventory SKU level Planning – Factory Physics Software Ownership Fill Rate Plant Level 245s Regular Tracking and Follow-up Discipline No over-running B, C, K Re-Alignment of long-lead orders Central Planning at EGS Customer Distribution Center Central Planning Columbus Atizipan Others S. Milwaukee
Central Planning - Moving Forward Move to SKU level planning policy Improve Forecasting on long lead time items Re-Align ABC policies with customer demand Scrub & Leverage Lead Time and Demand data Strategic Tactical Switch to a Pull system driven by Central Planning Balance Fill Rates and Inventory Levels by product line Robust management of actions supporting Ex 245 Additional S&OP Focus on Demand Patterns
Planning Group Responsibilities Dan Goodman S&OP Management Ron Hulsey (new) Master Scheduling MTS FG Ordering, Kanban Tom Schmitzer (new) ITO Management Factory Physics, Oracle Complexity Mgmt Mod Center Ordering Tom Murray Distribution Center Mgmt. Customer Service Liaison Joe Berri S&OP Process Ad Hoc Reporting Impromptu Programming Cyndi Knackstedt Buyout Planning Rosie Enriquez Project Coordination MTO Leadtime Mgmt GMDC - Marvin F. Delivery Analysis GMDC - Merlita T Daily/Weekly Reporting GMDC-Sherwin E Sola Buyer/Planner GMDC-Arvin Columbus Buyer/Planner Open – GMDC Planning Data Integrity GMDC-Delio Javier ECM Buyout Buyer/Planner GMDC-Joel P. Columbus Buyer/Planner Open – GMDC Planning Data Integrity GMDC-Christine M ECM Buyout Buyer/Planner Ultriva Analyst
ECM Product Groups Data Not Available
Sola and HCS Fill Rates Data Not Available
Inventory Bridge – Financial Review Expected to October Actual October Actual: $74.6M Sales Degradation is the largest challenge in controlling inventory
Pro-Forma POR with Revised COGS To maintain 4.8 Turns, $10M incremental inventory must be eliminated
ECM Inventory by ABC Code *Reserve for Obsolescence = $3,122k
Inventory Actions Completed • Change in order policy – Reducing Safety Stock and lot sizes for cast parts • Reducing Safety Stock on Buyouts with reliable supply chain – $1.07M • Canceling and rescheduling purchases of long-lead time buyouts product $2.8M • Production ramp down at Atizapan - $400k • Daily ordering in Columbus on parts with short lead times • Forecast proactively changed to reflect 20% downturn
Cast Product Inventory Alignment Goal of Program is to Avoid excess inventory. Will require additional support of Kanban and Lead Time Reduction programs
Safety Stock Alignment – ECM Buyouts • Fill rates historically have been above 90% with 10 day safety stock and 5 day Lot Sizes on A – Items • Larger lot sizes and safety stock policies were implemented in reaction to a spike in demand • Suppliers preferred smaller lot sizes because it provided quicker visibility of our demand pattern. • Parameters have changed to pre-July levels, avoiding over $1M in inventory. Safety Stock increased To Help Fill Rate