SciFi  L1 Trigger (CTT/CPS/FPS) Commissioning Overview. Hardware prototype commissioning: Done: DFEA tests with DFEC (1/2 crate) today/next week: G-link to L2/L3 August: serial copper link to MTM Firmware prototype commissioning:

sharla
Download Presentation

SciFi  L1 Trigger (CTT/CPS/FPS) Commissioning Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SciFi L1 Trigger (CTT/CPS/FPS) Commissioning Overview • Hardware prototype commissioning: • Done: DFEA tests with DFEC (1/2 crate) • today/next week: G-link to L2/L3 • August: serial copper link to MTM • Firmware prototype commissioning: • Today: fake 'CTOC' - L3 VRB communication test (using DFEA hardware) • next week: • real CTOC test (on prototype CTOC card); • fake 'CTOC' - L2 test stand communication test (using DFEA hardware)  August 1 milestone • as firmware becomes available: remainder of DFEx, CTxx, CPxx, FPxx tests • August: • FPTT - L1FPS MTM communication (Sateesh is almost ready with firmware), sharing Muon MTM crate • start tests of downloading under COMICS/EPICS • September: • DFEA - CTOC - CTQD - L2/L3 chain • switch to SciFi MTM crate • October: • DFES - CPSS - L2/L3 chain • DFEF - FPSS - L2/L3 chain • DFEA - CTOC - CTTT - L1CFT MTM chain • November: Examines • Production commissioning (7 crates): from Nov 2000 on

  2. Cal + Framework • Cal: working on • Analog Input card: prototype in 5k test • Quadrant-Region mezzanine card (new terms from L1 Cal) • readout card mods (with external vendor) • Framework: • installing final SCL cables + hub (aim for end of August) • testing readout FW - L3 into trigger mode VRB

  3. Update on theLevel 1 Muon TriggerHardware Status(as recalled by David Fein) Stefan Grünendahl for Ken Johns University of Arizona for the L1 Muon Group

  4. L1MU Hardware (Size of system: 11 crates (+ MRC crates from F/E readout group)) • MTCM (Crate Manager) 99% done • Commissioning of preproduction version ~95% complete • Production layout nearly complete • Production boards by 8/15 • MTCxx (Trigger Card) • ditto above + a few weeks • MTFB (Flavor Boards) • ditto above + a few weeks for MTM and MTC10 MTFB’s • Layout of preproduction MTC05 MTFB using ACEX technology in progress done • SLDB’s (Gbit/s Serial Links) • 3000 production boards (slowly) returning from assembler

  5. MCEN Hardware • MCCM (Crate Manager) • Final tests (communications using Hotlink, 1553, UART) of prototype in progress • MCEN (Centroid Finder Card) • Preproduction version assembled being tested • MCPB (Physics Boards) • Preproduction version layout in progress update  John Butler

  6. L1MU Infrastructure • Custom VME backplanes • L1MU production delivery in July • MCEN production ordered • are at Arizona • Power supplies • Prototype still needs to be assembled and tested: work starts today (D.F.) • Production version will immediately follow (available late September?) • Platform services • Racks and power installed (still true) • Cabling • Cable and connectors @ Fermilab • Cable maps for all cables exist • Production at NIU in progress • Will also try to take advantage of summer manpower • cable tester setup is at FNAL

  7. Progress to Date • MTM triggers sent to the TF using trigger logic with two PDT’s • Simple rates measured • L1MU MTM crate readout to the MRC • Data analyzed by eye sensible • redone with final L3 protocol; data written to file; L3 unpacking tested: success • Present problems • Handling of L1 Rejects (FPGA fixed but not tested):fixed

  8. Near Term Goals • early July • Stable operation of the L1MU MTM crate: done • mid-August • Stable operation of one (sparse) L1MU trigger crate and the L1MU MTM crate • Still using preproduction cards • mid-September • Add L1CFT MTM crate to the above • Power supply uncertain • early October • Begin commissioning production L1MU crates and cards everything still on track

  9. Near Term Asides • Examine • In progress (Pete Johnson is starting to work on this, using Dave Hedin's framework) • Fall commissioning people @ D0 • Rob McCroskey (hardware) • Pete Johnson (software) • Prototype power supply assembly is lagging starting today • Cable installation plan • Need have jumper cables ($) for the end region

  10. L1MU Production Commissioning Plan • 01 September 00 • MTCM’s (crate managers) • MTM MTFB’s (MTM flavor boards) • SLDB’s (serial links) • Infrastructure • 01-15 October 00 • MTCxx’s (trigger cards) • MTC10 MTFB’s (10 flavor boards) • MTC05 MTFB’s (05 flavor boards) • 01 December 00 • MCEN (centroid finders) • MCPB (centroid logic boards) • MCCM (crate managers)

  11. Conclusions Everything is going according to plan...