1 / 3

Goals of CNH project for Shuang Yang

Goals of CNH project for Shuang Yang. Paper -Interactions between implementation of PES (migration) and local livelihood (demography), addressing PES policies (early 2015)

Download Presentation

Goals of CNH project for Shuang Yang

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Goals of CNH projectfor Shuang Yang • Paper -Interactions between implementation of PES (migration) and local livelihood (demography), addressing PES policies (early 2015) - (If time allows) Interactions between environment changes and changes in human factors (environment changes will be measured by land use and land cover (LULC) changes with remote sensing technology) • Agent-based model (early 2015) - Integrate all human and environment (LULC) factors - Predict and visualize future livelihood (demographic) and LULC changes - Can ABM alone be a paper?

  2. Collected by myself - Socioeconomic survey data - PES survey data • From other team members - LULC remote sensing images - Vegetation classification data (if any) - Land parcel attributes data (if any)

  3. 2014 fieldwork - Leave US for China in early or middle of June - Train local helpers (one week) - Thank you gift for respondents and local officials who might help - Logistic arrangement (accommodate, transportation and so on) - Conduct survey on 700 households (about 4 weeks, vary with how many local helpers we hire) - Local data digitizing, correcting, cleaning, and compiling (one week) - Total estimated time for the fieldtrip: 6-7 weeks

More Related