FETS meeting 27th March 2007 Pepperpot MkII assembly by P. Savage

FETS meeting 27th March 2007 Pepperpot MkII assembly by P. Savage. Pepperpot MkII Development. Cooled feed through rod. The linear shift mechanism (LSML) from UHVDesign mounted to the main flange. Adjustable camera mount. Pepperpot MkII Development.

shepry
Download Presentation

FETS meeting 27th March 2007 Pepperpot MkII assembly by P. Savage

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FETS meeting 27th March 2007 Pepperpot MkII assembly by P. Savage

  2. Pepperpot MkII Development Cooled feed through rod. The linear shift mechanism (LSML) from UHVDesign mounted to the main flange. Adjustable camera mount.

  3. Pepperpot MkII Development The assembled grid head mounted to the cooled rod.

  4. Pepperpot MkII Development Close up of the assembled grid head showing the quartz plate.

  5. Pepperpot MkII Development (2) (1) (3) • The assembled pepperpot device will be delivered to RAL on Thursday 29th March 2007. We are waiting for the manufacture of the parts shown above. These are: • Camera to bellows recessed flange • Standard camera plate • Extended camera plate • It is hoped that they will be delivered before Easter. They will not necessarily prevent the setup and use of the device.