ISO-NE Load Forecast Methodology. April 2003 Forecast of Energy and Seasonal Peaks. For NEPOOL, States, and RTEP03 Sub-areas. Presentation to NESCAUM. David J. Ehrlich. Principal Analyst. Load Forecasting, System Planning. December 18, 2003.
E N D
ISO-NE Load Forecast Methodology April 2003 Forecast of Energy and Seasonal Peaks For NEPOOL, States, and RTEP03 Sub-areas Presentation to NESCAUM David J. Ehrlich Principal Analyst Load Forecasting, System Planning December 18, 2003
RTEP03 Peak Load and Installed Capacity MW by Sub-Area – 2003 (Peak Loads – 50/50 F/C) VT Load 1203 839 MW Under Construction RTEP LoadCapacity NB-NE - 700 Phase II - 1500 Highgate - 210 HQ NB Orrington South – 1050 Surowiec South - 1150 ME-NH – 1400 ME S-ME BHE Load 956956 MW Load 5331516 MW Load 312942 MW NH Load 16174006 MW Boston – 3600 East-West – 2400 BOSTON North-South – 2700 Load 52223613 MW NY-NE – 1550w/o Cross Sound Cable W-MA CMA/NEMA Load 19633681 MW Load 1634 206 MW NY SEMA/RI – 3000 SEMA RI CT Load 25503356 MW CSC -300 Load 22665140 MW Load 33504437 MW South West CT – 2000 SEMA – 2300 KEY: Connecticut Import– 2200 NOR Regional Transmission Expansion Plan Sub-area SWCT Load 1251444 MW Load 2263 2036 MW Priority Studies Required Norwalk-Stamford – 1100 Other Studies Required