Load Forecast and Basecase Development • Substation Transformer Loading (STL) Program • Data repository • Monthly actual peaks/energy • Load projections • Growth rates
Load Forecast and Basecase Development • Populating the database • STL • Non-coincident values • Forecast data • “Fitting” the load • Conforming vs. Non-conforming • ‘Scrunch’ factor
Load Forecast and Basecase Development Load level assumptions • Historical • 1-in-2 (2010 = 1493 MW) • Proposed • 1-in-10 (2010 = 1530 MW) • Scenarios: • 1-in-20 (2010 = 1541 MW) • 1-in-50 (2010 = 1553 MW)