1 / 12

802.11k Denver Closing Plenary Report

802.11k Denver Closing Plenary Report. Richard Paine richard.h.paine@boeing.com. Meeting Objectives. Whole Denver Meeting: LB78 Technical Comment Resolution Recirc Letter Ballot. Meeting Objectives Met. Whole Denver Meeting:. 100% LB78 Technical Comments Resolved 5 Motions.

Download Presentation

802.11k Denver Closing Plenary Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 802.11k Denver Closing Plenary Report Richard Paine richard.h.paine@boeing.com

  2. Meeting Objectives • Whole Denver Meeting: • LB78 Technical Comment Resolution • Recirc Letter Ballot

  3. Meeting Objectives Met Whole Denver Meeting: 100% LB78 Technical Comments Resolved 5 Motions

  4. Accomplishments • ~1600 Comments resolved • Draft P802.11k-D4.0 • Request to go to recirculation LB

  5. Objectives for May 2006 Plenary • Recirc Letter Ballot XX Comment Resolution Objectives for Jul 2006 • Recirc Letter Ballot XX

  6. Plans • Plan until next meeting: Weekly Teleconferences on Thu 12pm Eastern Time starting on 3/16/06. • Plan for start of next meeting: LBXX Recirc Letter Ballot Comment Resolution • Next major milestone: Letter Ballot Recirc after May 06

  7. Next Telecom 3/16/06 • 3/16/06 Meeting: • Comment processing

  8. Motion Move to request the IEEE 802.11 assigned numbers authority to reaffirm and allocate numbers for the following: Reaffirm Element IDs:AP Channel Report 51 Neighbor Report 52 RCPI 53 Allocate Element IDs: RSNI ? BSS Load ? Antenna Information ? Reaffirm Action Category: Radio Measurement 5

  9. 11k PAR Revision TGk requests the 802.11 WG to forward the proposed 11k PAR revision (extension to 2010 as found in document 06/0527r0) to NESCOM for consideration of the extension of the PAR. Moved on behalf of TGk: Kwak/Simpson 12/0/0 Second: Result:

  10. Motion Move to authorize TGk to go to 15 day recirculation LB with draft P802.11-D4.0. Moved on behalf of TGk: Gray/Black 10/0/0 Approve Disapprove Abstain

  11. Motion Move to request that the WG conduct a 15 day LB asking the question – “Do you believe that 11k draft P802.11-D4.0 is ready for WG recirculation ballot?” Move: Second: Approve Disapprove Abstain

  12. Motion Move to conduct a 15 day recirculation LB on 11k draft P802.11-D4.0 to commence as soon as practical after the WG authorization letter ballot and conditional on that ballot passing. Move: Second: Approve Disapprove Abstain

More Related