1 / 10

Status of the A LICE Maintenance and Operation Budgets C. Decosse

CERN-RRB-2009-087. Status of the A LICE Maintenance and Operation Budgets C. Decosse. M&O-A incomes and outstanding contributions 2002-2009 M&O-A 2009 current situation M&O-A 2010 preliminary budget M&O-A 2010 Sharing M&O-B 2010 preliminary budget and estimates for 2011-2013.

Download Presentation

Status of the A LICE Maintenance and Operation Budgets C. Decosse

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CERN-RRB-2009-087 Status of the ALICE Maintenance and Operation BudgetsC. Decosse

  2. M&O-A incomes and outstanding contributions 2002-2009 • M&O-A 2009 current situation • M&O-A 2010 preliminary budget • M&O-A 2010 Sharing • M&O-B 2010 preliminary budget and estimates for 2011-2013

  3. M&O cat. A income 2002-2009 (unit: kCHF)

  4. Outstanding M&O-A Contributions Procedure *): • If on 1 September the outstanding amount is less than, or equal to, the current year’s contribution: • CERN Finance Department sends a standard reminder to the F/A requesting payment within one month. • If on 1 September the outstanding amount is larger than the current year’s contribution: • ALICE Management sends a letter to the F/A announcing that, unless payment is made before the end of the year, the right to sign papers will be withdrawn as of December 31. • Total outstanding contributions > 2009 invoice: • China (Beijing and Wuhan HUST) • Poland • a payment plan to settle the major part of the outstanding invoices has been proposed by Poland and China CIAE. *) ALICE-INT-2006-005 4

  5. 2009 M&O-A situation (unit: kCHF on Oct. 8th, 2009)

  6. M&O-A budget evolution 2009-2013 (unit: kCHF) 2010 learning year as full running year

  7. Sharing of M&O-A budget Agreed procedure: • Establish effective 1 September the list of ALICE members by institute • This list will be valid for the next calendar year, and is the basis for sharing of the M&O A budget, but also: • authorship of ALICE scientific publications • voting rights in the CB • shift obligations The number of ‘scientists’ determines the sharing of the M&O A budget

  8. Sharing of the 2010 M&O-A Budget (unit: kCHF)Rebate from 2008 energy TotalBudget 2.592kCHFSpent 341.1 kCHF (13.2%)2008 Invoiced NMS 662.5 kCHF2008 Corrected NMS 87.2 kCHF2010 Rebate 575.3 kCHF

  9. M&O-B 2010 preliminary budget and estimates for 2011-2013 (Unit: kCHF) M&O MoU: “For Category B, the cost shall be shared by the Funding Agencies and Institutes concerned in a manner that the Collaboration shall propose to the RRB” So: sharing is left to the projects sharing proportional to investments is the most obvious solution

  10. 2010 M&O-B sharing (unit: kCHF)

More Related