Stave -1 status and other reports
Stave -1 status and other reports. Stave Loading Meeting, November 8 th 2011. G. Barbier , F. Cadoux , A. Clark, D. Ferrère , C. Husi , G. Iacobucci , A. La Rosa, J. Mesa, G. Pelleriti , M. Weber . Stave -1 about to be produced. October 6 th : Gluing of Genova flex onto stave
355 views • 11 slides