1 / 12

Visiting Scientist Program & Demonstration Plan

Visiting Scientist Program & Demonstration Plan. 2014 GOES-R/JPSS OCONUS R2O Interchange Meeting 30 July, 2014 Bill Ward ESSD Chief, Pacific Region Headquarters. Agenda. Visiting Scientist Program Demonstration Plan Summary. Visiting Scientist Program (VSP). VSP requirements Planning

sivan
Download Presentation

Visiting Scientist Program & Demonstration Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Visiting Scientist Program & Demonstration Plan 2014 GOES-R/JPSS OCONUS R2O Interchange Meeting 30 July, 2014 Bill Ward ESSD Chief, Pacific Region Headquarters

  2. Agenda • Visiting Scientist Program • Demonstration Plan • Summary

  3. Visiting Scientist Program (VSP) • VSP requirements • Planning • Software installations/instructions • Trip Report • CSPP Training • SSEC Provided the training • August 2013 • UH Classroom • Future Training for LEO & GEO CSPP Training? • SPoRT QPE Training • 5-9 May 2014 • WFO HNL-CPHC / PRH / Air Force • Future Training for QPE & other Products by SPoRT

  4. PR’s VSP Requirements • Planning • 3 – 4 months in advance • Initial contact is with the ESSD Chief • Further coordination w/ WFO management, ESSD SSM and OCONUS Satellite Research Scientist to refine dates and schedule the VSP training. • Software Installation(s)/Instructions • Will be passed on to the ESSD SSM and OCONUS Satellite Research Scientist for implementation and testing to ensure it does not interfere with Office Operations. • Trip Report • Trip report should be completed within 1 to 2 weeks of the visit • Contains all activities, issues, comments, future plans and recommendations for refinement from trainers and those trained

  5. VSP SPoRT Visit • First of two scheduled visits • 2nd trip is planned for October 2014 (Exact dates TBD) • Future SPoRT Plans • Lightning • QPE for Himawari 8/9 • Future product training development

  6. Products to be demonstrated / Trained on • Baseline • Lightning Detection • Volcanic Ash Detection & Height • Rainfall Rate / QPE • Total Precipitable Water • GOES-R Risk Reduction • Statistical Tropical Cyclone Intensity Models • Orographic Rain Index • Future Capabilities • Convective Initiation & Cloud Top Cooling Rates

  7. Demonstration Plan • Products to be demonstrated • Training • ORD & IOC • What does completion look like?

  8. TCFA GYRE Tropical Storm Halong (11W)

  9. American Samoa

  10. Summary • Future plans for VSP • Future Demonstration Products • August 4th meeting • NOAT GOES-R Pick-5 MTG

  11. Questions & Contact Information Bill Ward ESSD Chief, PRH Honolulu, Hawaii bill.ward@noaa.gov 808.725.6010 (Office) 808.722.9961 (Cell)

More Related