This project focuses on improving superconducting radiofrequency (SRF) technology for higher intensity proton accelerators and higher energy electron linacs. The objectives include cavity improvements, beam experiments, and the development of low-level RF techniques and diagnostic tools. The project also involves coordination and communication tasks, as well as research on crab cavities and thin films.
E N D
WP10 SRF: SC RF technology for higher intensity proton accelerators & higher energy electron linacs D.Proch EuCARD kick-off, CERN,Dec.08
WP 10 SRF D.Proch EuCARD kick-off, CERN,Dec.08
WP 10 Organisation D.Proch EuCARD kick-off, CERN,Dec.08
WP10 Objectives • The main activities in the SC RF Technology WP concentrate on two different areas: • cavity improvements and beam experiments. • Improved methods for cavity treatment such as vertical electro-polishing or sputter coating will be investigated. • Prototype work on superconducting (SC) crab cavities will be launched with the goal to increase the luminosity of colliders such as LHC, CLIC or ILC. D.Proch EuCARD kick-off, CERN,Dec.08
Objectives, cont. • The second research activity concentrates on further developing Low Level RF techniques and on new diagnostic tools based on the analysis of Higher Order Modes (HOM). These advanced and challenging concepts and ideas will be tested in the FLASH linac, and they are important for the extreme beam stability requirements and control problems in future projects. D.Proch EuCARD kick-off, CERN,Dec.08
WP10.1 SRF Coordination and communication • Coordination and scheduling of the WP tasks. • Monitoring the work, informing the project management and participants within the JRA. • WP budget follow-up. • Deliverable: 10.1.1 SRF web-site linked to the technical and administrative databases D.Proch EuCARD kick-off, CERN,Dec.08
WP10.2 SC Cavities for Proton Linacs, Electropolishing and surface investigations • Sub-task 1: Design and fabrication of b = 0.65 ; 704 MHz elliptical cavity equipped with a titanium helium reservoir. Preparation and assembly in clean room. Test of the cavity in vertical cryostat. • Sub-task 2: Design and fabrication of b = 1 ; 704 MHz elliptical cavity. Preparation of the cavity and assembly in clean room. Development of a vertical EP bench. • Sub-task 3: Study of interfaces between the cavity and the cryomodule. D.Proch EuCARD kick-off, CERN,Dec.08
WP10.2 Deliverables D.Proch EuCARD kick-off, CERN,Dec.08
SC Cavities for Proton Linacs • General background : • Upgrade of the LHC luminosity by replacing the injectors of the CERN complex by LINAC4, (LP-)SPL and PS2 Superconducting Proton Linac D.Proch EuCARD kick-off, CERN,Dec.08
New Injectors Normal Conducting Super Conducting The optimized design of the SPL accelerator is based on two families of SC cavities (beta=0.65 and beta=1.0) operating at 704.4 MHz at gradients of 19 MV/m and 25 MV/m, respectively. LP-SPL cavities • freq = 704.4 MHz • 2 families : • b=0.65 Eacc = 19MV/m 5 cells 42 cavités • b=1.0 Eacc = 25MV/m 5 cells 200 cavités • RF Power per coupler : 1MW (for b=1 cavities) D.Proch EuCARD kick-off, CERN,Dec.08
Task : SC Cavities for Proton Linacs 1) Study and prototyping of 704 MHz cavities (b=0.65 and b=1.0) ; Tests in vertical cryostat + 2) Development at Saclay of a vertical ElectroPolishing set-up which fits the dimensions of both cavity families CARE/SRF : 1-cell EP set-up Vertical Chemical Polishing = vertical EP for multicells D.Proch EuCARD kick-off, CERN,Dec.08
WP10.3 Crab cavities • Design, build and test a single LHC and CLIC crab cavity module, including input coupler, mode couplers and tuners. • Design, build and test a LLRF and synchronization system that meets the crab cavity phase and amplitude control specifications for LHC and CLIC. • If the beam time and the necessary hardware become available, validate and test the assembled crab system solutions and LLRF control systems on LHC and CTF3 in 2011; otherwise make performance predictions based on the measured noise characteristics. D.Proch EuCARD kick-off, CERN,Dec.08
WP10.3 Deliverables D.Proch EuCARD kick-off, CERN,Dec.08
Small crossing angle (~0.5 mrad): Global crab scheme is ideal choice for prototype Phase-I: Test feasibility of crab crossing in hadron colliders, Address all RF and beam dynamic issues, Small orbit excursion and tune shifts, Compatible with nominal and upgrade options to recover the geometric luminosity loss, Collimation optimisation! These cavities are feasible using available technology and the gradient requirements are within reach of current technology. Local crab crossing preferable (Phase-II): Independent control at IPs, Avoid collimation/impedance issues. Need compact cavities to fit in the IR region of the ring. Lower frequency hopefully! LHC-CC Local vs Global D.Proch EuCARD kick-off, CERN,Dec.08
CLIC-CC Developments D.Proch EuCARD kick-off, CERN,Dec.08
WP10.4 Thin Films • Improve the Nb sputtering technology for low beta cavities (magnetron sputtering) such as QWR to reach 6 MV/m at a Q-value of 5•108. • Perform arc sputtering of photo cathodes (Pb) and test the performance of the developed systems. • Research on new technologies for thin film depositing of superconductors for SC cavity applications (e.g. atomic layer deposition). D.Proch EuCARD kick-off, CERN,Dec.08
WP10.4 Deliverables D.Proch EuCARD kick-off, CERN,Dec.08
SCRF – thin film taskCERN – INFN – DESY –CI – IPNO -IPJ Objectives • Improve the Nb sputtering technology for low beta cavities such as QWR to reach 6 MV/m at a Q-value of 5 108. • Perform arc sputtering of photo cathodes (Pb) and test the performance of the developed systems • Research on new technologies for thin film depositing of superconductors for SC cavity applications D.Proch EuCARD kick-off, CERN,Dec.08
Courtesy J. Sekutowicz D.Proch EuCARD kick-off, CERN,Dec.08
Courtesy J. Sekutowicz D.Proch EuCARD kick-off, CERN,Dec.08
WP10. 5 HOM Distribution • Development of HOM based beam position monitors (HOMBPM). • Development of HOM Cavity Diagnostics and ERLP (HOMCD). • Measurement of HOM Distributions and Geometrical Dependences (HOMDG). D.Proch EuCARD kick-off, CERN,Dec.08
WP10. 5 Deliverables D.Proch EuCARD kick-off, CERN,Dec.08
HOM-couplers (pick-ups) Task 10.5 HOM based Monitors • HOM based monitors for • beam diagnostics • cavity/cryo-module diagnostics • DESY, Manchester Univ. / Cockcroft Inst., Rostock Univ. • experimental studies at FLASH, ERLP, the wire test facility at CI • Sub-task 1: HOM-BPMs • monitor 1 dipole mode and calculate beam position • proof of principle already made • resolution expected ~ 1 mm • advantages: • center beam minimize wakes critical for 3.9 GHz cav. and at low energies for the 1.3 GHz • no new vacuum component D.Proch EuCARD kick-off, CERN,Dec.08
Cavity alignment in ACC4 x [mm] ~100 mm rms y [mm] ~300 mm rms Task 10.5 HOM based Monitors (2) • Sub-task 2: Cavity diagnostics • study the HOM spectrum in each cavity to determine: • cavity alignment • cell geometry • Sub-task 3: Geometrical dependencies of HOM distributions • simulations combining finite element and S-matrix cascading techniques • multi-cavities, cell deformation, influence of couplers on spectrum etc. D.Proch EuCARD kick-off, CERN,Dec.08
WP 10.6 LLRF at FLASH • ATCA developments of carrier boards with FPGA and DSP. • Development of AMC modules with fast analogue IO and digital IO. • Development of special power drivers for AMC modules. • Development of beam based feedback. D.Proch EuCARD kick-off, CERN,Dec.08
WP 10.6 Deliverable D.Proch EuCARD kick-off, CERN,Dec.08
Institutions DESY Deutsches Elektronen-Synchrotron, Hamburg, Germany DMCS Department of Microelectronics and Computer Science, Technical University of Lodz, Poland ISE Institute of Electronic Systems, Warsaw University of Technology, Poland INP Niewodniczanski Institute of Nuclear Physics, Krakow, Poland IPJ The Andrzej Soltan Institute for Nuclear Studies, Swierk, Poland
Task 6: LLRF at FLASH • The present LLRF control system at FLASH does not fulfill the long term (3-10 years) requirements in several areas: Field regulation, availability, maintenance and operability. • The demand for high availability (HA), modularity, standardization and long time support favours the choice of the ATCA standards with carrier boards and AMC modules. • The ATCA technology comes from telecommunication industry and therefore availability of commercial boards needed for instrumentation is presently very limited but growing. • The LLRF control system for FLASH will be build using a modular approach basing on ATCA architecture. • The boards developed for the LLRF system can be used for other accelerator instrumentation needs including the control system.
AMC Zone 3 clk AMC M M M M clk Mainframe FPGA AMC PCIe switch Zone 2 Gbit switch clk Power reg. Power reg. DSP 25 x 25 DSP 25 x 25 Power reg. Power reg. M M User FPGA FF1513 Zone 1 ATC210 Main power regulator M M DSP 25 x 25 M M M M M M M M M M Power reg. Power reg. Power reg. Power reg. Power reg. Concept for LLRF based on ATCA Characteristic signals for the LLRF system AMC Boards: ADC (8 inputs) Timing VM Communication module Piezo controller Diagnostic ADC Digital I/O RTM Modules: 32 ch. down-converter Carrier Board: 32 ch. down-converter
WP10.7 SCRF gun at ELBE • Installation of an energy spectrometer in the ELBE beam line for slice diagnostics and slice emittance measurements for different emittance compensation schemes. • Design, build and test the set-up for preparation and application of GaAs photo cathodes in the SRF-Gun. • Evaluation of critical R&D issues of SRF guns like photocathode compatibility, advanced emittance compensation and application as a high-brightness polarized electron source. D.Proch EuCARD kick-off, CERN,Dec.08
WP10.7 Deliverables D.Proch EuCARD kick-off, CERN,Dec.08
EUCard - FZD D.Proch EuCARD kick-off, CERN,Dec.08
Superconducting RF Photo Gun at ELBE Unique test bench for SRF gun studies D.Proch EuCARD kick-off, CERN,Dec.08
New diagnostics: Slice emittance • Upgrade of cathode preparation & transfer system for GaAs photo cathodes • Study of photo cathodes (CsTe + alternative GaAs) in SRF Gun • Improved high-gradient cavity for SRF gun funding by German government D.Proch EuCARD kick-off, CERN,Dec.08
Motivation: GaAs cathodes in a SCRF gun could produce high-brightness & polarized electron beams - injector with low emittance for ILC Photo cathode preparation lab at FZD cathode transfer system SRF gun has sufficient vacuum (cryo pump) Modification of the preparation system Cs2Te -> GaAs Vacuum improvement 10-9 mbar -> 10-11 mbar D.Proch EuCARD kick-off, CERN,Dec.08
WP10.8 Coupler Development at LAL • Cleaning, HP rinsing and tests results on samples copper plated ad TiN coated ceramics. • Argon discharge cleaning measurements and coupler test • Realization of a system for automatic couplers cleaning D.Proch EuCARD kick-off, CERN,Dec.08
WP10.8 Deliverables D.Proch EuCARD kick-off, CERN,Dec.08
Outline TTF-III: DESY design • Conditioning & multipacting studies on TTF-III couplers (prototypes for XFEL) • Power coupler prototypes: TTF-V & TW60 • Titanium-Nitride (TiN) sputtering technology against multipacting on coupler ceramic windows TW60: LAL design TTF-V (LAL): based on TTF-III design TiN sputtering machine D.Proch EuCARD kick-off, CERN,Dec.08
-30 dB -35 dB 1.3 GHz Frequency (GHz) (dB) TTF-V coupler RF conditioning TTF-V RF conditioning Published in LINAC’08 (2008) TTF-V coupler pair assembled for the RF tests Low level RF measurements (TTF-V pair) Easy conditioning in 24 h only Next step: A TTF-V coupler pair will be conditioned at KEK following their conditioning procedure for ILC couplers (January 2009) D.Proch EuCARD kick-off, CERN,Dec.08
The sputtering machine Titanium target Magnetron Sputtering machine overview Sample of ceramic window Sample pretreatment: RF Etching Sample holder Reactive magnetron sputtering of TiN D.Proch EuCARD kick-off, CERN,Dec.08
WP10 SRF: SC RF technology for higher intensity proton accelerators & higher energy electron linacs Yes we can D.Proch EuCARD kick-off, CERN,Dec.08