Progress Report (November 14 - 20, 2002)

Progress Report (November 14 - 20, 2002). Progress:. HFE 4080-321 TO-46. “Rev. B” board submitted for fabrication. Receiver board alignment tolerance measurements completed. Transmitter board alignment tolerance attempted. Problem with VCSEL identification

skule
Download Presentation

Progress Report (November 14 - 20, 2002)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress Report (November 14 - 20, 2002) Progress: HFE 4080-321 TO-46 • “Rev. B” board submitted for fabrication. • Receiver board alignment tolerance measurements completed. • Transmitter board alignment tolerance attempted. • Problem with VCSEL identification • Possibly smoked VCSEL by applying too much bias current • Lifted a pad on the board when switching parts

  2. Planned Work (November 21 – 27, 2002) Planned work: • Build Rev. B boards • Test Rev. B boards with connectorized parts • Start alignment testing for Rev. B boards

  3. Gantt Chart

  4. RX Alignment Eye Diagrams Best Eye Y axis extreme X axis extreme

  5. RX Alignment Results Alignment Detection Graph