1 / 14

Milwaukee’s Best Brew Stand

Milwaukee’s Best Brew Stand. Ben Caya Carl Czajka. Second Update. Brewing Consultant Brewing Process Pump Vendor Frame Designs Gantt Chart. Brewing Process – Step 1. Sanitize, Sanitize , Sanitize (Star San) Crush Grain Activate yeast. Brewing Process – Step 2.

snana
Download Presentation

Milwaukee’s Best Brew Stand

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Milwaukee’s Best Brew Stand Ben Caya Carl Czajka

  2. Second Update • Brewing Consultant • Brewing Process • Pump Vendor • Frame Designs • Gantt Chart

  3. Brewing Process – Step 1 • Sanitize, Sanitize, Sanitize (Star San) • Crush Grain • Activate yeast

  4. Brewing Process – Step 2 • Heat water in HLT so mash tun is about 162°

  5. Brewing Process – Step 3 • Sparge from HLT to mash tun • ~60 min process

  6. Brewing Process – Step 4 • Mash out • 170° to stop starch conversion • Drain until clear liquid comes out then pour back into Mash Tun • Checking for sediment in liquid

  7. Brewing Process – Step 5 • Drain Mash Tun into the Boil Kettle • 5 gallons batch will have about 2 gallons

  8. Brewing Process – Step 6 • Add liquid from HLT to Mash Tununtil you fill grain bed • Sit for ~10 min

  9. Brewing Process – Step 7 • Add enough liquid from Mash Tunto Boil Kettle to get desired amount

  10. Brewing Process – Step 8 • Start boil (60 min) • Add bitter hops • Other flavors • 15 min later add aroma hops

  11. Brewing Process – Step 9 • Chill to 70 deg F • Carboy (ferment) (3 weeks – months)

  12. Frame Design

  13. Frame Design

  14. Gantt Chart

More Related