1 / 10

Optimise Mining Projects in Adelaide

Solution for Construction is committed to client relationships fostered through integrity. Being an independent service, we can be flexible to our clientu2019s needs u2013 providing turnkey solutions involving all facets of engineering. You work with one company, for everything. Our engineers will help you evaluate your project, recommend the best solutions and tailor a detailed action plan.

Download Presentation

Optimise Mining Projects in Adelaide

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How To Prevent Deviating From An Architect’s Drawings

  2. Inconsistency between architect and drawings from other trades is a common problem in the construction industry. Not only is it costly for the project at hand, it can impact a builder’s reputation (and compromise future work).While there’s a clear distinction between the respective industries, the roles of engineers, trades and architects are, in fact, quite similar.

  3. Working together, from the beginning As most architects would suggest, all aspects of the contextual conditions should be reflected first, in the design and drawings. Yet, for engineers, we understand that these are often simply a framework. It can be a challenge to translate ideas on paper to a real-world setting.

  4. The key is to ensure that at the drawing phase, both engineers, trades and the architects are on the same page. Working in collaboration from the beginning of the project will reduce mistakes at the construction stage.

  5. Ongoing communication Miscommunications in drawings can be avoided with clear communication between stakeholders. As you know, building plans are part of a project’s legal documentation and are integral for more than just a building perspective.The next time a set of drawings comes across your desk and you’re concerned by certain aspects, answer the following questions:• What is the goal?• Why is it not clear?• How can I rectify this?

  6. It’s really this simple – just ask. It’s better to spend time clarifying with the designer or client immediately, rather than wasting money with guesswork. Mistakes happen, but not those that can be avoided with a few questions.

  7. Set aside your ego Many problems can be avoided by leaving your ego at the door and remembering the client is the focus. It’s better to keep them happy, than to be ‘right.’ Admittedly, some clients are less agreeable than others, but when your reputation is on the line, it won’t pay to be pedantic.

  8. Tips to ensure project consistency Like we always say, do it right the first time. If this means investing extra time in the preliminary stages, it’s a worthwhile investment of your time.Keep in mind the following pointers to help you facilitate successful projects.• Clearly show relevant details and labels

  9. Add reference points to the drawing for comparison, such as finish ground level• Include total length and height of object in every detail drawing• Carefully check the subcontractor drawing vs. the architect’s version, communicating any areas of difference between the two• If in doubt about an issue, call an expert.For more information about making construction project work in accordance with architect’s drawings, talk to our team of project managers

  10. Naveesh is a proud member of Engineers Australia. We are proud members of Civil Contractor Federation SA.

More Related