An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rawson SPMT Design • Project Delivery • Design Considerations • Lessons Learned

  2. Project Delivery • Design Bid Build vs. Design Build • Partnering • BOS Involvement

  3. Design Considerations - Guidance • UDOT • FHWA • WisDOT • UDOT - Manual for the Moving of Utah Bridges Using Self UDOT- Propelled Modular Transporters (SPMTs) • SPMT Process Manual And Design Guide FHWA - Manual on Use of Self-Propelled Modular Transporters to Remove and Replace Bridges

  4. Design Considerations - Loads • Bridge Staging Area • Prior to Bridge Move

  5. Design Considerations - Loads • Bridge Staging Area • Prior to Bridge Move • Bridge Move • Final

  6. Lessons Learned • Design • Partnering • Innovation • Updates

  7. Lessons Learned - Design • Travel Path • Diaphragms

  8. Lessons Learned - Design • Travel Path • Diaphragms • Coupler Detailing • Miscellaneous Details • Schedule

  9. Lessons Learned - Partnering

  10. Lessons Learned - Innovations • Abutment Panels

  11. Lessons Learned - Updates • Bridge Manual • Specifications

  12. Phil’s Slides BOS 2013

  13. Construction • Bridge Staging Areas • Space requirements • Geotechnical investigation • Level terrain for travel Path • Positive drainage • Environmental considerations Rawson Bridge Staging – East Span Rawson Bridge Staging – West Span

  14. Construction • Shoring Towers • Two (2) span 45W girder bridge • Timber crane pads • Steel shore towers • Steel header • Anchorage for lateral loads and stability Shoring Tower – West Span Shoring Tower – East Span

  15. Construction • Self Propelled Modular Transporter (SPMT) • Ground improvements on travel path • Steel plates for turning radius • Space for bracing and existing shore towers • 138’ feet wide • 95’ feet long

  16. Construction • SPMT • Heavy lift contractor • Submittal reviews • 35 semi-loads of equipment • Site access • Assembled in 48 hours • Public viewing area

  17. Construction • Pre-Move Deck Crack Inspection • Deflection monitoring during bridge Move • Post move crack inspection • Pier closure pours • May 28thto June 23rd closure window

  18. Construction • Pre-cast pier construction • Driven pile and cast in place pile cap • Detailed bar steel placement with template • High early strength masonry

  19. Construction • Pre-cast concrete columns • High strength bar steel couplers • Footing to column connection • Column to precast cap connection • 8000 psi non shrink grout

  20. Construction • Pre-cast pier construction • Pre-cast concrete cap • Sections up to 45 tons – Two (2) crane pick • Grouted bar coupler Connection to columns • Tight construction tolerances • Survey control

  21. Construction • Pre-cast pier construction • Lessons learned: • Detail additional room for bar couplers • Comprehensive survey control • Steel templates for bar steel • Match cast pre-cast elements

  22. Construction • Keys to Project Success • Public outreach and involvement • Close coordination with prime and heavy lifter • Travel path preparation and planning • Project partnering with stakeholders

  23. Rawson Bridge Move ***Bill to Insert SMPT Bridge Move Video ***