Withlacoochee Regional Water Supply Authority Final Water Supply Plan Update July 2014

Withlacoochee Regional Water Supply Authority Final Water Supply Plan Update July 2014. Presentation Topics. Key Topics of the Water Supply Plan Demand Projections Source Evaluation Groundwater Availability Comparison of Sources to Demands Public Input Process Completion Schedule

sregister
Download Presentation

Withlacoochee Regional Water Supply Authority Final Water Supply Plan Update July 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Withlacoochee Regional Water Supply Authority Final Water Supply Plan Update July 2014

  2. Presentation Topics • Key Topics of the Water Supply Plan • Demand Projections • Source Evaluation • Groundwater Availability • Comparison of Sources to Demands • Public Input Process • Completion Schedule • Board Action to Accept the Final Draft

  3. Public Supply Demand Projections (2010-2035)

  4. Demand Projections for All Use Categories (2010-2035)

  5. Water Source Evaluation • The Availability of Water from all Sources by 2035 was Quantified • Public Supply Water Conservation • Reclaimed Water • Groundwater • Surface Water • Seawater Desalination

  6. Water Source EvaluationPotential Water Supply Availability in 2035

  7. Determining the Availability of Groundwater for Water Supply through 2035 • Groundwater availability was determined through the Use of the SWFWMD’s Northern District Model • The projected 2035 water demands were adjusted to account for the effects of water conservation and use of reclaimed water, then input into the model.

  8. Regional Groundwater Modeling

  9. Regional Groundwater ModelingPredicted Flow Reduction for Major Springs

  10. Regional Groundwater ModelingConclusions • SWFWMD • The 2035 demands for all use categories can be met with groundwater from the Upper Floridan aquifer with no exceedencesto springs and rivers for which MFLs have been proposed or adopted. • Groundwater from the Upper Floridan aquifer will be sufficient to meet demands through 2035 only if demand is reduced by water conservation and aquifer drawdowns are offset by recharge from the use of reclaimed water. • The implication of this result is that beyond 2035, the ability of groundwater from the Upper Floridan aquifer to meet demand may be limited in certain areas.

  11. Regional Groundwater ModelingConclusions • SJRWMD • MFLs for Silver Springs/Silver River are currently being developed by the SJRWMD and will likely impact resource availability. • An analysis by SJRWMD staff indicates that the current draft MFLs would not be met under 2035 projected demands. • The SJRWMD is working on tools to assist in the development of a prevention/recovery strategy.

  12. Projected 2035 Demand in the SWFWMD and SJRWMD Portions of the WRWSA SWFWMD – 76 mgd SJRWMD – 21 mgd 97 mgd

  13. Public Input Process • Water Management District/Water Supply Utility Input • Over 100 technical and editorial comments • Public Input • Withlacoochee Area Residents • Longer planning horizon • Concerns about relying on the Lower Floridan aquifer • Expanded cost analysis • Eliminating seawater desalination as an option • Cross Florida Barge Canal Water Supply Option

  14. Timeline for Completion of the Water Supply Plan • Final Draft Due to the SWFWMD by July 25th

  15. Staff Recommendation: • Board Acceptance of the Final Report and Approval for Submittal to the SWFWMD