An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Donor Conference Ministry of Energy of Georgia

  2. Current situation • Technical problems • Power sector of Georgia – not build to operate independently • Economic problems • Collection rate • Not metered • High Indebt ness • Not rehabilitated properly for 10 years • Financial aid needed for transition period and basic rehabilitation

  3. Objectives • Self-Sustainability – profitability • Independently operational • Without additional subsidies from donors and / or government • Attractive for private investment • Energy Security • Utilization of transit opportunities • Multiple sources for import • Differentiated markets for export • Otherwise politically and economically dependent • No prospect for economic development • Social tension

  4. Policy • Collection rate • Main problem • 40% collection rate • Investment in metering • Legislation against theft of electricity • Public awareness campaign • Rehabilitation and construction of new grid and high voltage lines • Turkey, Azerbaijan, Russia, Armenia • Rehabilitation of Existing Hydropower Plants • 40-45 % of installed capacity • Spend less on imports

  5. Energy System of Georgia 500KW Ministry of Energy

  6. Hydro Power Plants of Georgia Planned: Hudon HPP 600MW Enguri HPP 1300MW – 700MW Vardnili HPP 210MW – 60MW Shaori HPP 38MW – 18MW Lajanuri HPP 111MW – 30MW Jinvali HPP 130MW – 90MW Dzevrula HPP 80MW – 54MW Gumati I,II HPP 66MW – 39MW Rioni HPP 48MW – 45MW Vartsikhe Cascade HPP 184MW – 132MW Khrami II HPP 110MW – 0MW Khrami I HPP 112MW – 60MW Ministry of Energy

  7. Current achievementsWithout additional investments • Decreasing of electricity looses in high voltage grid • 17% in Winter of 2003 – 9.6% in Winter of 2004 • Relatively improved supply of electricity – up by 16% • Installation of meters at borders with neighbor countries • State budget investment - 2,5 mln USD per month • Enguri HPP rehabilitation project co-financing • Wholesale & commercial metering • Urgent maintenance • Rehabilitation of the 1st unit of Vardnili HPP (70 MW) • Detailed business plan for 2004-2005 • Improved legislation for financial rehabilitation

  8. Projects • Metering • Improved collections • Decreased consumption • Rustavi example • Rehabilitation of HPP • 40 - 50% of installed capacity • “Quick Hit” program • Rehabilitation of Gardabani TPP • Electricity for base load • Problem – Funds for natural gas supply • Rehabilitation of the network • Increased system stability • Winter Heat Program • Improved supply and help vulnerable