300 likes | 409 Views
Recent Bond Accomplishments. Bordeaux Elementary Remodel. New Evergreen Elementary. New Olympic Middle School. Upgrades to CHOICE School. Upgrades to CHOICE School. New 40-year roof New windows New carpet in office and classrooms Hallways and office re-lamped with T-8 technology
E N D
Upgrades to CHOICE School • New 40-year roof • New windows • New carpet in office and classrooms • Hallways and office re-lamped with T-8 technology • New ADA compliant restrooms • New ADA compliant rear entry with elevator and foyer
Upgrades to Shelton High School • Some new HVAC units • New seating, lights and sound in auditorium • New 40-year roof on stadium • New, more effective and efficient lighting in gym • New, quieter and more efficient HVAC system in gym
Upgrades to Shelton HS (con’t) • New, hardwood gym floor • New, more efficient gas boilers for heating swimming pool • New, more effective ventilation system for swimming pool • New swimming pool back wall and roof • New deduct water meter • Installation of full natural gas capacity
Upgrades at Mt. View Elementary • Parking and traffic improvements: - safer, more efficient traffic flow - new student drop off area - additional parking • Site improvements: - improved field drainage - retention pond - better storm water management
Upgrades at Mt. View (con’t) • Safety improvements: - improved fire loop - additional fire hydrant - new breezeway and playshed • Interior and exterior paint
Other Bond Accomplishments: • Purchased Administrative Services Building • Purchased Maintenance Facility • Demolished Angle Education Center • Purchased portables at all 3 elementary schools
Mt. View Elementary • Complete modernization of school: • New heating and ventilating system • Upgraded restrooms • Improve kitchen facilities • Increase natural light / add windows • New interior finishes • Upgraded exterior finishes
Mt. View Elementary (con’t) • Additional space to connect library building to main building • Relocate administration office to west end by new parking lot - New main entry to building • Complete modernization of annex
Shelton High School • Replace buildings 300, 400, 500, 600 and 700 with 57,000 sq. ft. of new building • Demolish buildings 300, 400, 500, 600 and 700 • The new building would “connect” remaining buildings 100, 200, 1100 and 1200 to make a single school structure • Buildings 100, 200, 1100 and 1200 would be modernized
Shelton High School (con’t) • The single structure would enhance student safety and staff supervision • The new structure would be built completely outside the airport “no-fly zone” • Gym building and shop building would be completely modernized • Increase parking facilities • Provide for future school expansion
Shelton High School Athletic Needs • Build new visitor bleachers • 1,200 seats • covered seating • press box • Build visitor ticket booth / concession stands / restrooms • Remodel restrooms and concessions below existing grandstands and add new area for locker rooms and offices
Shelton HS Athletic Needs (cont’) • Provide new artificial turf football / soccer field • Replace existing track surface
CHOICE School • Provide new heating / ventilating system • Improve electrical system • Replace P.A. system • Improve water piping • Remodel kitchen and add area to increase size • New kitchen equipment
CHOICE School (con’t) • Improve lighting and sound system in auditorium • Provide operable wall at stage to create additional teaching space • Provide science lab classroom • Provide “manufacture” classroom
Transportation Facility • Remodel existing garage and 4 service bays • Increase bus parking area • Remodel existing office space • Add on to office space to provide • Larger staff meeting room • More restroom fixtures • Improved office layout
Administrative Services Building • Improve heating / ventilating system
Maintenance Facility • Demolish existing unused outer buildings • Build a 3,000 sq. ft. addition to existing metal building • Remodel existing metal building, shop and office areas • Create a lobby / entrance area with elevator to second floor
Maintenance Facility (con’t) • Improve parking • Improve site security • Lighting • Fencing • Electronic locks
Mountain View Elementary Modernization & Addition • Shelton High School New-in-Lieu & Modernization • Shelton High School Athletic Needs • CHOICE School Remodel • Technology Upgrades • Administrative Services Building Upgrades • New Elementary School #4 • Maintenance Building • Transportation Facility