Recent Bond Accomplishments

Recent Bond Accomplishments. Bordeaux Elementary Remodel. New Evergreen Elementary. New Olympic Middle School. Upgrades to CHOICE School. Upgrades to CHOICE School. New 40-year roof New windows New carpet in office and classrooms Hallways and office re-lamped with T-8 technology

stacey
Download Presentation

Recent Bond Accomplishments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RecentBondAccomplishments

  2. Bordeaux Elementary Remodel

  3. New Evergreen Elementary

  4. New Olympic Middle School

  5. Upgrades to CHOICE School

  6. Upgrades to CHOICE School • New 40-year roof • New windows • New carpet in office and classrooms • Hallways and office re-lamped with T-8 technology • New ADA compliant restrooms • New ADA compliant rear entry with elevator and foyer

  7. Upgrades to Shelton High School

  8. Upgrades to Shelton High School • Some new HVAC units • New seating, lights and sound in auditorium • New 40-year roof on stadium • New, more effective and efficient lighting in gym • New, quieter and more efficient HVAC system in gym

  9. Upgrades to Shelton HS (con’t) • New, hardwood gym floor • New, more efficient gas boilers for heating swimming pool • New, more effective ventilation system for swimming pool • New swimming pool back wall and roof • New deduct water meter • Installation of full natural gas capacity

  10. Upgrades at Mt. View Elementary

  11. Upgrades at Mt. View Elementary • Parking and traffic improvements: - safer, more efficient traffic flow - new student drop off area - additional parking • Site improvements: - improved field drainage - retention pond - better storm water management

  12. Upgrades at Mt. View (con’t) • Safety improvements: - improved fire loop - additional fire hydrant - new breezeway and playshed • Interior and exterior paint

  13. Other Bond Accomplishments: • Purchased Administrative Services Building • Purchased Maintenance Facility • Demolished Angle Education Center • Purchased portables at all 3 elementary schools

  14. CurrentFacilityNeeds

  15. Mt. View Elementary • Complete modernization of school: • New heating and ventilating system • Upgraded restrooms • Improve kitchen facilities • Increase natural light / add windows • New interior finishes • Upgraded exterior finishes

  16. Mt. View Elementary (con’t) • Additional space to connect library building to main building • Relocate administration office to west end by new parking lot - New main entry to building • Complete modernization of annex

  17. Mt. View Elementary (con’t)

  18. Shelton High School • Replace buildings 300, 400, 500, 600 and 700 with 57,000 sq. ft. of new building • Demolish buildings 300, 400, 500, 600 and 700 • The new building would “connect” remaining buildings 100, 200, 1100 and 1200 to make a single school structure • Buildings 100, 200, 1100 and 1200 would be modernized

  19. Shelton High School (con’t) • The single structure would enhance student safety and staff supervision • The new structure would be built completely outside the airport “no-fly zone” • Gym building and shop building would be completely modernized • Increase parking facilities • Provide for future school expansion

  20. Shelton High School (con’t)

  21. Shelton High School Athletic Needs • Build new visitor bleachers • 1,200 seats • covered seating • press box • Build visitor ticket booth / concession stands / restrooms • Remodel restrooms and concessions below existing grandstands and add new area for locker rooms and offices

  22. Shelton HS Athletic Needs (cont’) • Provide new artificial turf football / soccer field • Replace existing track surface

  23. CHOICE School • Provide new heating / ventilating system • Improve electrical system • Replace P.A. system • Improve water piping • Remodel kitchen and add area to increase size • New kitchen equipment

  24. CHOICE School (con’t) • Improve lighting and sound system in auditorium • Provide operable wall at stage to create additional teaching space • Provide science lab classroom • Provide “manufacture” classroom

  25. Transportation Facility • Remodel existing garage and 4 service bays • Increase bus parking area • Remodel existing office space • Add on to office space to provide • Larger staff meeting room • More restroom fixtures • Improved office layout

  26. Administrative Services Building • Improve heating / ventilating system

  27. Maintenance Facility • Demolish existing unused outer buildings • Build a 3,000 sq. ft. addition to existing metal building • Remodel existing metal building, shop and office areas • Create a lobby / entrance area with elevator to second floor

  28. Maintenance Facility (con’t) • Improve parking • Improve site security • Lighting • Fencing • Electronic locks

  29. RECOMMENDATIONS

  30. Mountain View Elementary Modernization & Addition • Shelton High School New-in-Lieu & Modernization • Shelton High School Athletic Needs • CHOICE School Remodel • Technology Upgrades • Administrative Services Building Upgrades • New Elementary School #4 • Maintenance Building • Transportation Facility