Evaluating The Use of RouteMatch Software in Billings MET Transit

Evaluating The Use of RouteMatch Software in Billings MET Transit. David Kack, Program Manager Mobility and Public Transportation. TRB Rural Conference October 20, 2008. Agenda. Technology Overview MET Transit Overview Implementation and Evaluation. Technology Overview.

stacy
Download Presentation

Evaluating The Use of RouteMatch Software in Billings MET Transit

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Evaluating The Use of RouteMatch Software in Billings MET Transit David Kack, Program Manager Mobility and Public Transportation TRB Rural Conference October 20, 2008

  2. Agenda • Technology Overview • MET Transit Overview • Implementation and Evaluation

  3. Technology Overview • Computer Aided Scheduling and Dispatching Software (CASD) • Automatic Vehicle Location (AVL) • Mobile Data Communication (MDC)

  4. General Outcomes • CASD software reduces vehicles in service from 200 to 130 • Santa Clara County, CA • CASD software reduces its operating cost per vehicle-mile 8.5 % and its operating cost per passenger 2.4% • Winston-Salem Transit Authority Source: Volpe, 2000

  5. Billings MET Transit • City of approximately 102,000 • Largest city in Montana • MET Transit is a City Department • MET operates both a fixed route and paratransit system (MST)

  6. MST • Must be ADA Paratransit Eligible • Provides 250-300 rides per day • Fifteen total vehicles • Eight vehicles out on a “typical” day • Can have up to 12 vehicles out on a busy day

  7. MST Software • Mobility Master Software • No support after 2003 • Looked for support for purchasing new software

  8. Process • Initial Paper – Billings MET Transit Paratransit Technology Review • “Sales Calls” by Vendors • RFP • Installation – “Go live”

  9. Evaluation • Collect three months of “before” data • Collect three months of “after” data • Same three months • Try to hold all variables constant • Fuel • Weather and road construction • Demand • Etc.

  10. Evaluation Factors • Rides per mile • Rides per hour • Cost per ride • Pick up time performance • Drop off time performance • Survey results from dispatchers • Survey results from drivers

  11. Efficiency

  12. Efficiency – cont’d

  13. Cost • Purchase price = $83,575 • Annual fee = $11,835 • 5 year life span • $28,550 savings needed to breakeven • Equates to 3.3% savings needed in hours and/or mileage to break-even

  14. Time Performance

  15. Time Performance

  16. Dispatcher Survey

  17. Driver Survey

  18. Summary • Not enough information for a benefit/cost analysis • Break-even analysis shows only small (3%) reduction in service hours, or mileage necessary • 2006 vs. 2005 data shows rides/mile and rides per hour increase in efficiency

  19. Additional Research • Follow-up to see if efficiency continued into 2007 and 2008 • Resurvey drivers and dispatchers

  20. Contact David Kack, Program Manager Mobility and Public Transportation Western Transportation Institute 406-994-7526 dkack@coe.montana.edu www.wti.montana.edu