1 / 19

QA Report

QA Report. Madison, Wisconsin April 2013. QAAG conference call (17 April) 2012 QA Reports Field Surveys – in progress HAL – in progress CAL – in progress AMNet – in progress External Reviews 2013 PO: scheduled (11-13 June) Gary Lear, USEPA – team leader Amy Ludke, USGS

starbuck
Download Presentation

QA Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. QA Report Madison, Wisconsin April 2013

  2. QAAG conference call (17 April) 2012 QA Reports Field Surveys – in progress HAL – in progress CAL – in progress AMNet – in progress External Reviews 2013 PO: scheduled (11-13 June) Gary Lear, USEPA – team leader Amy Ludke, USGS Kristi Morris, NPS

  3. OR18 equipment installation

  4. Training

  5. Training Webinars CAL sample change-out: January 2013 electronic raingages: March 2013 NTN sample processing: May 15, 2013 HAL sample change-out: February and March 2013 motorbox and sensor change-out: May 9, 2013 AMNet – pending USGS Field Audit Program

  6. Webinars can be recorded and made available afterwards. Questions and Answers compiled and posted afterwards. 100% of all survey respondents stated that they would participate in future webinars.

  7. Re-prioritizing NTN and AIRMoN Analytes Historically, 4-6% of NTN samples are “wet-dilute” 3% of NTN samples are pH-conductivity only FR50 testing unfiltered, undiluted filtered, diluted filter blanks (filtered, undiluted) Testing with real samples

  8. Motion The NTN analysis order should be changed, moving pH and conductivity measurements from the start of the analysis sequence to the end of the analysis. The CAL should implement this change as soon as possible. If the change cannot be implemented by fall meeting, a timetable should be presented at fall meeting for implementing the change.

  9. Motion The NTN analysis order should be changed, moving pH and conductivity measurements from the start of the analysis sequence to the end of the analysis. The CAL should implement this change as soon as possible. If the change cannot be implemented by fall meeting, a timetable should be presented at fall meeting for implementing the change.

More Related