Electrical QA

IPMU, 19 March 2012. Electrical QA. Markus Friedl (HEPHY Vienna). Readout Chain Overview. Analog APV25 readout is through copper cable to FADCs Junction box provides LV to front-end. Finesse Transmitter Board (FTB). FADC+PROC. 1748 APV25 chips. ~2m copper cable. Junction box.

chi
Download Presentation

Electrical QA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IPMU, 19 March 2012 Electrical QA Markus Friedl (HEPHY Vienna)

  2. Readout Chain Overview • Analog APV25 readout is through copper cable to FADCs • Junction box provides LV to front-end Finesse Transmitter Board (FTB) FADC+PROC 1748APV25chips ~2mcoppercable Junctionbox ~10mcopper cable Unified opticaldata link (>20m) COPPER Front-endhybrids Rad-hardDC/DC converters Analog level translation,datasparsificationandhit time reconstruction Unified Belle IIDAQ system M.Friedl (HEPHY Vienna): Electrical QA

  3. Layer 6 Origami Ladder • 5 DSSD sensors (4 rect + 1 slanted), 10 hybridsin total • 6 hybrids (=connectors) read out in BW, 4 read out in FW M.Friedl (HEPHY Vienna): Electrical QA

  4. Testing • Option A: read out one sensor at a time • APVDAQ: Needs 3 VME modules + repeatersOne set reads 4 APVs: 2 needed for p-side (6 APVs) with special cable (we can provide it) and one for n-side (4 APVs) • Option B: read out full ladder at once • Reading out full ladder would require 15 APVDAQ sets • Alternative: use subset of final system (“1/20 system”) • Enough to read out full ladder at once M.Friedl (HEPHY Vienna): Electrical QA

  5. Ladder Test • Option A • APVDAQ – 4 APV input channels • Needs 3 sets to read out one DSSD with special adapter cable M.Friedl (HEPHY Vienna): Electrical QA

  6. Ladder Test • Option B • Subset of Belle II SVD • 1/20 test system would be sufficient • Requires 9UVME crate M.Friedl (HEPHY Vienna): Electrical QA

  7. Ladder Test • Option B • Exactly what we have as a prototype system since 2007 • Has been used in several beam tests • New system (with junction box instead of repeaters) is now being designed M.Friedl (HEPHY Vienna): Electrical QA

  8. Additional Infrastructure • Test box • Closed box (light tight) with x/y stage and beta source (90Sr) • Can scan all sensors • Fully automatic operation (overnight) • Laser not recommendedas it cannot reach stripsunderneath ribs • Software • To be adapted for testsand scanning M.Friedl (HEPHY Vienna): Electrical QA