1 / 13

Electrification Planning and Technology Options: the Case of Latin America

Electrification Planning and Technology Options: the Case of Latin America. Xiaoping Wang @ Nay Pyi Taw, Myanmar May 31, 2013. A Bridge to Universal Energy Access. A Bridge to a Sustainable Energy Future. Evolution of LAC Electricity Access: 1970-2010. Source: IDB/OLADE.

starr
Download Presentation

Electrification Planning and Technology Options: the Case of Latin America

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electrification Planning and Technology Options: the Case of Latin America Xiaoping Wang @ Nay PyiTaw, Myanmar May 31, 2013 A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

  2. Evolution of LAC Electricity Access: 1970-2010 Source: IDB/OLADE A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

  3. ElectricityCoverageVariesby Country: 2010 Source: IDB/OLADE A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

  4. Urbanization and Slum Dwellers Pose Lose-lose Challenges for Both Users and Service Providers Note: Size of bubble denotes number of slum dwellers (Million, 2010) Source: UN Habitat Data Base A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

  5. Access to Electricity is a High Political Priority in LAC • Vision—Social Electrification • Intermediate Goals • Dedicated Institutions • Mechanisms for Keeping Strategies Updated A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

  6. Countries with various rates of electrification have developed planning and implementation capacity A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

  7. Off-grid applications are integrated into national electrification plans because of… • Social Equity • Balanced Regional Development • Pre-electrification – bicycle vs. Mercedes A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

  8. A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

  9. Different Technology Options are Taken into Account in Least Cost Electrification Planning A Bridge to Universal Energy Access

  10. A Wide Range of Technologies are Employed in the World Bank Rural Electrification Projects in LAC A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

  11. There is Need to Enabling Better Energy Access in Urban and Peri-Urban Areas Link with city development strategies Multi stakeholder collaboration Strong political will A regulatory framework supporting access for the urban poor Change in mindset of slum dwellers A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

  12. Summary: Lessons Learned • Political commitment to provision of energy services and social equity is essential • Developing planning and implementation capacity is a key enabler • National electrification plan is a guiding document and should be kept updated • Off-grid technologies are cost-effective for certain segments of users, and complements grid extension • Provision of reliable, sustainable energy services in peri-urban and urban areas remain great challenges and requires multi-stakeholder, multi-sector approaches. A Bridge to Universal Energy Access A Bridge to a Sustainable Energy Future

  13. XIAOPING WANG, XWANG3@WORLDBANK.ORG

More Related