WP7: Beam feedback and control systems

WP7: Beam feedback and control systems. Philip Burrows John Adams Institute Oxford University. WP7: Goals. 1) Training 2) Prototype ILC intra-train beam feedback system + contribute engineered design to EDR 3) Study of EM backgrounds and optimisation of IP FB system design against them

Download Presentation

WP7: Beam feedback and control systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University Philip Burrows LCABD Meeting, RHUL 12/04/07

  2. WP7: Goals 1) Training 2) Prototype ILC intra-train beam feedback system + contribute engineered design to EDR 3) Study of EM backgrounds and optimisation of IP FB system design against them 4) Design + simulation of integrated global alignment, FB + luminosity tuning strategy for EDR Philip Burrows LCABD Meeting, RHUL 12/04/07

  3. WP7: RDB report 1) Training 2) Prototype ILC intra-train beam feedback system + contribute engineered design to EDR VERY HIGH 3) Study of EM backgrounds and optimisation of IP FB system design against them HIGH/MODERATE 4) Design + simulation of integrated global alignment, FB + luminosity tuning strategy for EDR MODERATE – ‘ESSENTIAL’ Philip Burrows LCABD Meeting, RHUL 12/04/07

  4. WP7: Cut scenarios New Cost in k£ Philip Burrows LCABD Meeting, RHUL 12/04/07

  5. WP7: Deliverables Philip Burrows LCABD Meeting, RHUL 12/04/07

  6. WP7: Deliverables Philip Burrows LCABD Meeting, RHUL 12/04/07

  7. Deliverables: 2) intra-train FB • 2. Design of ILC intra-train beam feedback system contributed to EDR: • Complete FONT4 beam tests • ATF2 feedback system 1): • micron-level stabilisation of incoming beam in x,x’,y,y’ • with 3-bunch train • ATF2 feedback system 2): • ditto with 20-60 bunch train • Bench test system for feedback algorithm development • Engineered design for ILC system for EDR • Design for ATF2 ‘goal 2’ system Philip Burrows LCABD Meeting, RHUL 12/04/07

  8. Deliverables: 3) EM backgrounds • 3. Study of EM backgrounds and optimisation of design against them: • EM background simulations • Complete 1st round FONT@ESA beam tests (2007) • Design change + 2nd round beam tests (2008) • Design optimisation + 3rd round beam tests (2009) • Engineered design for ILC system for TDR Philip Burrows LCABD Meeting, RHUL 12/04/07

  9. Deliverables: 3) EM backgrounds – cut A • 3. Study of EM backgrounds and optimisation of design against them: • EM background simulations • Complete 1st round FONT@ESA beam tests (2007) • Engineered design for ILC system for TDR Philip Burrows LCABD Meeting, RHUL 12/04/07

  10. Deliverables: 4) Integrated design • 4. Design of integrated global alignment, FB + luminosity tuning for TDR: • Integrate IP intra-train and BDS (5Hz) feedback design • Integrate linac and BDS feedback design • Global alignment, feedback + tuning strategy defined • Design contributed to TDR Philip Burrows LCABD Meeting, RHUL 12/04/07

  11. Deliverables: 4) Integrated design – cut A • 4. Design of integrated global alignment, FB + luminosity tuning for TDR: • Integrate IP intra-train and BDS (5Hz) feedback design • Design contributed to TDR Philip Burrows LCABD Meeting, RHUL 12/04/07