110 likes | 259 Views
WP7: Beam feedback and control systems. Philip Burrows John Adams Institute Oxford University. WP7: Goals. 1) Training 2) Prototype ILC intra-train beam feedback system + contribute engineered design to EDR 3) Study of EM backgrounds and optimisation of IP FB system design against them
E N D
WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University Philip Burrows LCABD Meeting, RHUL 12/04/07
WP7: Goals 1) Training 2) Prototype ILC intra-train beam feedback system + contribute engineered design to EDR 3) Study of EM backgrounds and optimisation of IP FB system design against them 4) Design + simulation of integrated global alignment, FB + luminosity tuning strategy for EDR Philip Burrows LCABD Meeting, RHUL 12/04/07
WP7: RDB report 1) Training 2) Prototype ILC intra-train beam feedback system + contribute engineered design to EDR VERY HIGH 3) Study of EM backgrounds and optimisation of IP FB system design against them HIGH/MODERATE 4) Design + simulation of integrated global alignment, FB + luminosity tuning strategy for EDR MODERATE – ‘ESSENTIAL’ Philip Burrows LCABD Meeting, RHUL 12/04/07
WP7: Cut scenarios New Cost in k£ Philip Burrows LCABD Meeting, RHUL 12/04/07
WP7: Deliverables Philip Burrows LCABD Meeting, RHUL 12/04/07
WP7: Deliverables Philip Burrows LCABD Meeting, RHUL 12/04/07
Deliverables: 2) intra-train FB • 2. Design of ILC intra-train beam feedback system contributed to EDR: • Complete FONT4 beam tests • ATF2 feedback system 1): • micron-level stabilisation of incoming beam in x,x’,y,y’ • with 3-bunch train • ATF2 feedback system 2): • ditto with 20-60 bunch train • Bench test system for feedback algorithm development • Engineered design for ILC system for EDR • Design for ATF2 ‘goal 2’ system Philip Burrows LCABD Meeting, RHUL 12/04/07
Deliverables: 3) EM backgrounds • 3. Study of EM backgrounds and optimisation of design against them: • EM background simulations • Complete 1st round FONT@ESA beam tests (2007) • Design change + 2nd round beam tests (2008) • Design optimisation + 3rd round beam tests (2009) • Engineered design for ILC system for TDR Philip Burrows LCABD Meeting, RHUL 12/04/07
Deliverables: 3) EM backgrounds – cut A • 3. Study of EM backgrounds and optimisation of design against them: • EM background simulations • Complete 1st round FONT@ESA beam tests (2007) • Engineered design for ILC system for TDR Philip Burrows LCABD Meeting, RHUL 12/04/07
Deliverables: 4) Integrated design • 4. Design of integrated global alignment, FB + luminosity tuning for TDR: • Integrate IP intra-train and BDS (5Hz) feedback design • Integrate linac and BDS feedback design • Global alignment, feedback + tuning strategy defined • Design contributed to TDR Philip Burrows LCABD Meeting, RHUL 12/04/07
Deliverables: 4) Integrated design – cut A • 4. Design of integrated global alignment, FB + luminosity tuning for TDR: • Integrate IP intra-train and BDS (5Hz) feedback design • Design contributed to TDR Philip Burrows LCABD Meeting, RHUL 12/04/07