1 / 15

Makes it possible for customers to;

UFAB in Uddevalla and Shanghai. Makes it possible for customers to;. Focus on their core activities. Expand through flexible production capacity. Reduce their production costs. Release tied-up capital. UFAB i Uddevalla och Shanghai. Develop – Manufacturing - Assembly

Download Presentation

Makes it possible for customers to;

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UFAB in Uddevalla and Shanghai Makes it possible for customers to; Focus on their core activities Expand through flexible production capacity Reduce their production costs Release tied-up capital

  2. UFAB i Uddevalla och Shanghai • Develop – Manufacturing - Assembly • High technical machines • Turnover 2009; 11 MEUR • Employees 2009; 40 • Quality First! – ISO 9001:2008 • 40 years experience – 1500 system • Cost reduction – Lean • Environmental - ISO 14001:2004

  3. Mattsson Wind

  4. Technique put in system

  5. Reference Assembly • Quality - National Oilwell Varco Norway AS • UFAB assemble and test complete units for offshore. Tests are made together with customer and delivery are made directly to oil platform.

  6. Reference Assembly • Complexity - Tetra Recart • UFAB assemble and test complete system with a capacity of 24 000 packages an hour. Order lead time are 21 weeks where 3 500 articles are manufactured, assembled and tested.

  7. Reference Assembly • Flexibility - Tetra Top • UFAB delivers complete customer specified modules in tact without any delays. Order lead time are 15 working days and the assembly and final testing takes 500 hours per module.

  8. Referenser Montering • Future - WindEn • UFAB assemble wind turbines in the sizes 5,5 – 8 – 45 kw. These are used for private persons and farmyards and produces between 15 000 and 100 000 kw per year

  9. Reference Assembly • Volume - VGB • UFAB assemble and deliver 2000 snow chains to all big manufacturers of trucks and buses. Order lead time are between 1 and 5 days with 3000 different articles.

  10. Reference Assembly • Partnership - GE Healthcare • UFAB has during two years been participating in the prototype phase together with the customer. Serial production has started and forecasted annual volume are 600 units.

  11. Reference Development • Idea to Reality - GreenClip • UFAB has for the customer developed an automatic labeling machine for high volume products. The assembly and installation at site has also been performed by UFAB.

  12. Reference Development • Mechanical development • Ensure quality in development • Easy to assemble • Reduce manufacturing costs • Assembly and test documentation • Simulations • ProEngineer, SolidWorks, AutoCAD, Framemaker • Automation • Electrical development • PLC programming • Siemens S7, Rockwell, GE FANUC • Simulations • Profibus (Siemens) Devicenet (Rockwell)

  13. Future targets and commitments Quality First in all steps of the process 20 MEUR in turnover 2011 Workshop to manufacture parts in China 2010 Achieve all Key indicators and customer satisfaction 2010 Lean – Increase cross functional team work 2010

  14. Summary • System supplier with a Quality First approach • Lean – value stream mapping and 5s for cost reduction • 40 years experience - 1500 systems delivered • Developed supplier network and a workshop in China • Quality and Environmental certificate ISO 9001 and ISO 14001 • Strong position with the Mattsson Group