1 / 13

DISTRICT RURAL DEVELOPMENT CELL BURDWAN ZILLA PARISHAD

WELCOME. DISTRICT RURAL DEVELOPMENT CELL BURDWAN ZILLA PARISHAD. SELECTION OF NEW GPRP. In case of selection of new GPRP, Memo No. 2038(31)/DRDC/ZP/BDN/VIII/44(Vol.-14)dated 08.06.10. of this Office should be followed strictly

stuart
Download Presentation

DISTRICT RURAL DEVELOPMENT CELL BURDWAN ZILLA PARISHAD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WELCOME DISTRICT RURAL DEVELOPMENT CELL BURDWAN ZILLA PARISHAD S.KAR, LDO, DRDC, BZP

  2. SELECTION OF NEW GPRP • In case of selection of new GPRP, Memo No. 2038(31)/DRDC/ZP/BDN/VIII/44(Vol.-14)dated 08.06.10. of this Office should be followed strictly • Gram Panchayat Resource Person (GPRP) should be discontinued who has already been engaged in ICDS, ASHA etc. projects. A competent woman SHG (preferably SGSY) member would be engaged in that place and the report would be sent to this Cell in the prescribed format immediately • Honorarium of newly selected GPRP may not be considered until the Engagement Report to be received as per prescribed format S.KAR, LDO, DRDC, BZP

  3. HONORARIUM OF GPRP • Strictly follow the instruction as per Memo No. 2530(31)/DRDC/ZP/BDN/VIII/44(Vol.-4)dated 11.09.2009. • GPRP working as SHPI should only claim honorarium @ Rs.500/- / @ Rs.750/- (for ‘A’ graded GPRP) per month and honorarium @ Rs.100/- for attending the monthly meeting. • Honorarium for extra work (full day/Half day) may be considered only for performing the SGSY work and this should claimed as per prescribed format. • Presence of GPRP for sanctioning of bank loans disbursement (both C-C & Project) is not mandatory, so it should not be encouraged. S.KAR, LDO, DRDC, BZP

  4. ANALYSIS OF PERFORMANCE OF GPRP On the basis of Monthly Report of GPRP February, 2012 S.KAR, LDO, DRDC, BZP 4

  5. REPORT PENDINGFOR THE MONTH OF February, 2012 Name of the Panchayat Samity: • Galsi-I (Late submission) • Purbasthali-I S.KAR, LDO, DRDC, BZP

  6. % SHG for which C-C A/C yet to be opened

  7. Average limit of C-C A/C per SHG (Rs.)

  8. Average loan absorption capacity per SHG from C-C A/C (Rs.)

  9. Average loan absorption capacity per SHG from Savings A/C

  10. % of SHG not enjoyed C-C A/C

  11. Times of Bank Loan over Savings of SHG

  12. % of SHG to be linked with economic activity

  13. S.KAR, LDO, DRDC, BZP

More Related