TPC online  offline calibration

TPC online  offline calibration. November 2002. Outline. Online: tracking down TPC failure Current status Online  offline Plan for Y3 To do list. The TPC is not perfect! Need to track down failures. What fails? Gas mixture  online velocity monitor Precision need to be improved

styer
Download Presentation

TPC online  offline calibration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TPC online  offline calibration November 2002

  2. Outline • Online: tracking down TPC failure • Current status • Online  offline • Plan for Y3 • To do list

  3. The TPC is not perfect!Need to track down failures • What fails? • Gas mixture  online velocity monitor • Precision need to be improved • Readout board (RDO) • Loss of several rows  need to carefully record failure • Front End Electronic boards (FEE) • Anode HV modules • … cathode  we are dead!

  4. Current TPC status

  5. Current TPC status • Electronic is in good shape • Thanks to repair done last week • Thanks to Danny, Kenny and Javier • HV module 20-5 flaky • May have to be turned off

  6. Tools to track down failures? • Online (Panitkin’s) monitor • Crude drift velocity from laser • HV/electronic failures (but hard to see noise) • Can be used by shift crew • Pad monitor for experts • Very reliable diagnostics from Blair • Only problem: no direct communication to offline • Pulser and pedestal data analysis • In DAQ (Tonko) or online (“me”) or offline (“me”)

  7. What offline needs to know about • Bad runs • Tagged by shift crew and experts • Bad channels (for simulated data) • Y1/Y2 from offline analysis of pulser data • Y3 from DAQ100 • need to access bad channel list • Electronic gain and t0 correction • Y1/Y2 apply offline (st_tpc_daqmaker) • Y3 done by DAQ100 • If offline cluster finder used, need to get gain and t0 from DAQ

  8. Plan for Y3 • Failure tracking by shift crew (online display), DAQ100 and experts • Bad channels tagged by DAQ100 • Need to fill up offline database • Gain and t0 corrections from DAQ100 • Applied automatically for DAQ100 data • Need to fill up offline database for “pixel”data

  9. To do list • Improve online display • Better display of channels to see noise • Compare current run to a reference run • Better online drift velocity calculation • Connect DAQ100 to offline database (critical) • Need to access gain table, t0 table and bad pad table • Improve pulser • check electronic linearity for dEdx study • Multiple pulses, different amplitudes, shapes, …

  10. Dennis Reichhold is taking over this job My thanks to Alexei, Blair, Howard W, and Jim for their support during the last 2 years.