10 likes | 101 Views
Potential Organization Structures for the Conveyance Working Group. Option 1 [As described in draft purpose and scope]. Option 2 [No separate Operating Criteria TT, operating criteria addressed directly in WG]. Conveyance WG. Conveyance WG. Model Assumptions TT. Operating Criteria TT.
E N D
Potential Organization Structures for the Conveyance Working Group Option 1 [As described in draft purpose and scope] Option 2 [No separate Operating Criteria TT, operating criteria addressed directly in WG] Conveyance WG Conveyance WG Model Assumptions TT Operating Criteria TT Fish Facility TT Habitat and Operations TT Fish Facility TT Model Assumptions TT Option 3 [Two separate TTs to address operations (HOTT & OCTT)] Conveyance WG Habitat and Operations TT Operating Criteria TT Fish Facility TT Model Assumptions TT February 15, 2008