An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. F3. GAMA European Office Key Regulatory/Rulemaking Activities

  2. Renewed Focus on GA • GA Strategy Paper • CS-23 Reorganisation • GA Sub-SSCC • 2nd Meeting, Hosted by GAMA in Brussels - October 4th 2013 • Cross Functional GA Perspectives • Design & Manufacturing • Flight Standards • Engineering & Maintenance • Air Traffic Management • Aerodromes

  3. EASA Fees & Charges • New Fee Structure – In Place Early 2014 • Readjustment to Certification Activity Fees • Significant Increases in Continued Airworthiness Fees • Validation Fee Discount • FAA/EC Negotiated Initial 5% Reduction • 2-Year+ Review Cycle to Adjust Based on Data

  4. Single European Sky • Data Link • 1.1.2011 – Forward Fit Deadline • 12.21.2012 – Exemption Deadline • 2.7.2013 – NAA Ground Deadline (Grp. A) • 2.5.2014 – NAA Ground Deadline (Grp. B) • 2.5.2015 – Retrofit Deadline • Currently: • Ground - 5 of 12 NAA’s Compliant (Belgium, Germany Luxembourg, Netherlands, Switzerland) • Air - ≈ 30% of IFR Aircraft Compliant (Flight Plan Info) • EC Decision on 3rd Round of Exemptions – Mid October 2013 • Technical Problems – Dropped Link 1 of 10 & VHF Deafness • EUROCONTROL – October 23-24th Stakeholder Meeting

  5. Single European Sky • Navigation • EUROCONTROL Concept for Advanced RNP • Approach – 2018 • All Phases – 2020 • RNP + Timing (4-D) – 2022 • Non-Precision Approaches Shutdown by 2018 (Replaced w/RNP)

  6. Data & Voice Recording • Data Link Communication Recording • Separate Electrical Bus for CVR/FDR • 10±1Min CVR Battery • Dual Combination CVR/FDR if Over 15.000Kg • Underwater Locator Beacons • 90-Day Battery • Additional 8.8kHz Beacon if Over 27.000Kg (ICAO Considering 90-day Battery) • ADRS & CARS on Airplanes Below 5.700Kg

  7. Icing Rulemaking • EASA Annual Safety Conference: “On-Ground & In-Flight Icing” October 15-16th 2013 – Cologne • Harmonization of CS25 Icing Rules • Updated Icing Environment (SLD, Ice Crystal Env.) • New Engine Certification Standards (Similar to FAA) • New Airframe Detection & Protection Standards (Similar to FAA, Upper Weight Limit May Differ)