1 / 14

ASTeC Research Strategy

ASTeC Research Strategy. Mike Poole Director. ASTeC Strategic Objectives. Establish and consolidate UK core accelerator skills base leadership and advice to stakeholders Ensure international competitiveness (people + programme) Develop future LSF

sun
Download Presentation

ASTeC Research Strategy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ASTeC Research Strategy Mike Poole Director Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  2. ASTeC Strategic Objectives • Establish and consolidate UK core accelerator skills base • leadership and advice to stakeholders • Ensure international competitiveness • (people + programme) • Develop future LSF • (advice, design, prototype, construction) • Promote suitable CCLRC activities (DL + RAL) • Pursue underpinning technology • (inc. experiments) • Encourage collaborations • (AIs + HEIs + international) Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  3. Key Elements • Underpinning design studies • Beam dynamics simulations • New technology demonstration • Advanced beam test facilities • Major networking with HEIs and overseas laboratories • Knowledge transfer • Recruitment Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  4. Programme Outline • Project support • ERLP FETS MICE 4GLS ILC NFSRS DIAMONDXFEL FAIR • Underpinning generic studies • Types • Gun linac ERL synchrotron storage ring FFAG BTS • Categories • Conceptual (and Technical) Design Studies • Beam dynamics and Radiation Sources • Technologies - magnetics, RF diagnostics vacuum science collimation and dumps Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  5. ASTeC Funded LC Programme Extrapolated SR02 funds = £6M over 3 years Policy decision: • 25% on LC programme: £1.5M • of which £500k available to promote HEI studies • LC-ABD support to be demonstrated • Priority to synergetic activities (eg Light Sources) Agreed joint work packages with HEIs: • Collimation • Longitudinal bunch diagnostics • BPM R&D Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  6. ASTeC Funded Work Packages (3 year) 1. Collimation (ASTeC/Lancaster) • wake field simulations + experiments • £500k (inc RA) 2. Temporal Profile (ASTeC/Abertay) • electro-optic developments (+ small SP support) • ultrafast laser for tests • £600k (inc RA) 3. Advanced BPMs (ASTeC/Cambridge/UCL) • use in high precision spectrometry • £250k (inc RA) 4. Access to Test Beams at SLAC (All groups) • £100k support costs on ESA NB CCLRC also funds international advisory panel and travel administration Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  7. EU Programmes • Previous FP5: EUFELERF Cavity* • FP6 I3 contracts: HIPPI ELAN PHIN • FP6 awards: EuroTeV EUROFEL * Officially completed NB Major problem of overhead recovery FP7 presents major challenges Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  8. Underpinning R&D • Laser based accelerator systems (with CLF and HEIs) • Novel magnet systems (with EID and HEIs) • Vacuum science research collaborations (inc MMU contract) • Advanced RF technology (with HEIs) ca £500k pa staff costs(70% ASTeC) NB This excludes generic R&D elements of funded project programmes Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  9. Planned ASTeC Income 05/06 TOTAL ~ £8M Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  10. Planned ASTeC Expenditure 05/06 Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  11. Long Term Investment Priorities • Sustainable skill base • Funding of prototypes • Integrated SRF design/construction/testing facility • Build and operate e-FFAG Model (on ERLP) • Construct e and p Accelerator Test Facilities (DL + RAL) • Ramp up R&D funding prior to Capital Facility NB All of these involve HEI collaboration and cross-Council interests Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  12. Proposed SRF Technology Initiative • Maturity and applicability of superconducting RF systems • including 4GLS and ILC - potential major UK role • Demanding superconducting RF infrastructure • Integrated design, build and test (HP) - nowhere in Europe ! • Collaboration • ASTeC/HEIs/Industry/Faraday Partnership/NWDA • Exploit Daresbury infrastructure • Unsuccessful bids to PPARC (£10M ?) Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  13. Proposed site for EMMA: e-FFAG Model Build for £4M ? Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

  14. Issues • Training • Prototype Funding • Infrastructure • Collaborations • Publications Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

More Related