GRAC Proposals. Ron Gibbons & Skip Watts VTTI / Radford University. Proposals. We are considering two projects which can provide input for VDOT in the selection and application of barriers Establishment of a Rockfall Barrier Lifetime Testing Program

sun
Download Presentation

GRAC Proposals

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GRAC Proposals Ron Gibbons & Skip Watts VTTI / Radford University

  2. Proposals • We are considering two projects which can provide input for VDOT in the selection and application of barriers • Establishment of a Rockfall Barrier Lifetime Testing Program • Evaluation of Rockfall Behavior for the Selection of Rockfall Barriers

  3. Barrier Selection • rigid and Flexible Rockfall Barrier Systems • The economic balance of a fence and flexible system needs to be identified in order to determine which systems are the most suitable for each application. • Typically: • rigid systems • Areas which have few rock strikes • Flexible systems • Areas which have significant (continuous) rock events

  4. Establishment of a Rockfall Barrier Testing Program • One of the inputs to an economic analysis would be the lifetime of the barrier system • This project considers the development of a Barrier testing program which will provide this data

  5. Barrier Lifetime • Flexible systems have a lifetime which is determined by the tension/available slack in the brake ring • Lifetime can be violated by a pole strike • rigid systems are not designed to deform • Their lifetime is determined by number of hits until a deformation occurs • Pole or fence deformation

  6. Barrier Testing • Very few sites have on-going rockfall barrier testing programs • Switzerland • Italy • Japan • Colorado • Site now closed • Some other state programs exist to test in-situ • California • Ohio – Just started • Oregon • Washington

  7. Test Methods Vertical Drop Slide

  8. Test Rocks • Calibrated standard weight cuboctahedrons • Painted for video analysis

  9. Test Methods • There are few existing test methods for the evaluation of barriers • TRB project assessing Recommended Practices for testing Flexible barriers • No known rigid testing procedures

  10. Project Proposal • On a controlled rock slope with an installed barrier, rocks are rolled into the barrier. • Deformation and energy absorption is measured. • The total lifetime can be calculated. • Rolling results can also be verified in lab testing • Swing armature testing with weighted ball • We propose this is for a rigid barrier system only

  11. Project Tasks • Setup of the test site • The Smart Road can provide a consistent slope in a controlled environment that can allow for the testing • Equipment Setup • Need: • High speed video cameras (2 or 3) to measure the rolling rock and capture the deformation • Tension and Stress meters on the fence and the posts • Fence Installation • Meeting the spec of VDOT • Testing • Rolling stones • Lifetime Estimation • Calculation of total allowable energy and stress impacts before fence failure

  12. Smart Road Test Area

  13. Smart Rocks • Consider developing Smart Rocks • Since we are creating the rocks, we can add intelligence to the system • Acceleration and speed remotely transmitted through radio frequency to determine energy characteristics at the point of impact • Possibility of adding a data logger to the rock as well • Access can be an issue • Need to add close distance radio detection to the required equipment

  14. Mobile Testing Fields • Once the test method has been developed in a controlled environment, we should be able to test at any location with the developed equipment setup • Testing a variety of rockfall and slope conditions • Appalachian Plateau versus Ridge and Valley • Testing a variety of fence systems

  15. Benefits to VDOT • This project would provide a system for continual rockfall barrier testing for VDOT. • It would also provide the method for lifetime estimation of the rockfall barrier systems and the subsequent cost benefit analysis.

  16. Evaluation of Rockfall Behavior for the Selection of Rockfall Barriers • Develop a method to select the appropriate type of rockfall barrier based on the potential for rockfall events • Consider both Hazard and Risk • Hazard: • A condition likely to produce a rockfall • Risk • Probablity of a hazardous event causing damage or loss • Develop a cost assessment method to assist in the selection and specification of the mitigation techniques

  17. Development of Hazard Model • Develop a model which can predict the probability of a rockfall event • Based on typical rockfall triggers • Climate • Erosion • Slope type • Rock type • Underlying Geology

  18. Existing Models • Several Models exist that can predict rockfall behavior: • These systems consider geology only, or geology and weather factors • Early models are limited: • Do not consider all rockfall modalities • Do not consider all risk types • Many do not consider Mitigation factors • Some new models provide probability along with the assessment of slopes through video and LIDAR data collection • Missouri • Utah • Athens, Greece • NCHRP IDEA Project 119

  19. Hazard Monitoring • On going monitoring of the rockwalls can provide on-going hazard assessment • Colorado • California • Missouri • These systems typically: • Analyze the rockslope over time with repeated LIDAR measurements • Compare changes • Identify and track potential problems • Typically Software models • ROCKPACK • Split-FX • CRSP

  20. LIDAR Change Identification

  21. Risk Assessment • Some areas have developed Risk Assessment models • These models consider both the hazard probability and the potential outcome • The models must consider Roadway Design Factors and Human Exposure • Roadway • Ditch capacity • Barriers • Medians • Human Exposure • Stopping distance • AADT • Speed • Traffic Volume

  22. Rating System

  23. Alternative Systems – Fault Trees

  24. Project Tasks • Phase I – Model Development • Hazard Model Verification • Using existing data from VDOT and Brian Bruckno, evaluate the models that are available for the probability of rockfall events • Risk / Mediation Development • Link exposure models from other activities • Develop rating system • Develop economic analysis for rockfall mediation • Phase II – Scanning and Data Collection Development • Link Measurement activities • LIDAR scanning • Software prediction

  25. Benefits to VDOT • This project would provide a method for VDOT to select the appropriate equipment and ensure that the VDOT expenditures are appropriately assigned. • Future Efforts can provide an evaluation and control method to maximize effectiveness of VDOT investments