90 likes | 107 Views
Explore the latest updates on the tower expansion project, including the go-live dates for the new Intensive Care Unit and Progressive Care Unit. Get all the details about the units, features, room numbering, and more. Stay informed and prepare for the upcoming changes and enhancements at the facility.
E N D
Go-live date: • May 19
Project Timeline April 29 May 18 April 22 March 22 March 25 April 15-16 Through Sept May 19 Fit-up installment Units set/stocked Post go-live optimization Incident Command Training begins Certificate of Occupancy OHA survey complete Go-live May 8 Sneak Peek
Intensive Care Unit • Location: Level 1 adjacent to current ICU • Accessible via a skywalk that will connect the two buildings • Badge-access unit • New Features • 24 beds • Unit will have three AII (negative pressure) with an ante room • There are also four high-capacity/accessible rooms • These rooms will be fully outfitted with new equipment • Room Numbering • Rooms will be four digits and start with 8 (8101-8124)
Progressive Care Unit • Location: Level 2 adjacent to IMCU • Accessible via new elevator located at the entrance of the new ICU • 28 beds • Naming Convention • Progressive Care Unit • Existing Procedural Care Unit will move into the vacated ICU in early 2020 and be renamed the Short Stay • Patient Type • Step down patients with a primary medical or surgical diagnosis will be cared for on the Progressive Care Unit • Step down patients with a primary cardiovascular diagnosis will continue to be cared for on the IMCU • Room Numbering • Rooms will be four digits and begin with an 8201-8228 • Admission • New admissions with diagnosis suitable for care on this unit will be accepted beginning May 19