1 / 7

MAN POWER DETAILS IN SRLDC

MAN POWER DETAILS IN SRLDC. As on 01.01.06. EXECUTIVES 33 SUPERVISORS 09 WORKMEN 25 TOTAL 67. MAN POWER DETAILS. BUDGET UTILISATION. BUDGET UTILISATION. All figures in lakhs of Rs. RLDC EXPENDITURE 2004-05.

suzuki
Download Presentation

MAN POWER DETAILS IN SRLDC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAN POWER DETAILS IN SRLDC As on 01.01.06 • EXECUTIVES 33 • SUPERVISORS 09 • WORKMEN 25 • TOTAL 67

  2. MAN POWER DETAILS

  3. BUDGET UTILISATION

  4. BUDGET UTILISATION All figures in lakhs of Rs.

  5. RLDC EXPENDITURE 2004-05 • EMPLOYEE COST - 3.89 Crores • ADMINISTRATIVE COST - 1.56 Crores • DEPRECIATION - 0.06 Crores • INTEREST & FINANANCE • CHARGES - 0.08 Crores • TOTAL COST - 5.59 Crores • CERC APPROVED REIMBURSEMENT - 5.70 Crores

  6. ISSUES • ULDC AMC CONTRACT WITH GE HARRIS • NEGOTIATIONS WITH LOCAL VENDORS TO HAVE AMC • TATA HONEYWELL • CDAC • NELCO • IMPORT OF UI FROM NEIGHBOURING REGIONS • Whwnever the flow on HVDC Bhadravathi Crosses 750 MW, Oscillations are observed. • NON DESPATCH OF NAPTHA AND GAS/DIESEL GENERATION • Proposal of change in UI slope

More Related