190 likes | 204 Views
Technical Capabilities of NCP Man Power. RPC Group Pakistan. 1999. 2009. Organizational Chart. P.M Project Manager P.C Project Coordinator Q.A M Quality Assurance Manager T.C Technical Coordinator. Cont.
E N D
Technical Capabilities of NCP Man Power RPC Group Pakistan 1999 2009 National Centre For Physics
Organizational Chart P.M Project Manager P.C Project Coordinator Q.A M Quality Assurance Manager T.C Technical Coordinator National Centre For Physics
Cont.. 1. Commissioning: Saleh Muhammad / Hassan Shahzad / Waqar Ahmed / ImranMalik 2. Installation: IshtiaqHussain/Hassan Shahzad/ M.Imran 3. Assembly: IshtiaqHussain / Waqar Ahmed / Saleh / Imran / Hassan / Wajid / Shahid/Arshad 4. Quality Assurance: M.ImranMalik/Jamila Butt/ ShamonaFawad / Ashiq 5. Physics Performance: M.IrfanAsghar/ ShamonaFawad/Jamila Butt 6. DCS: Hassan Shahzad / TaimoorKhurshid 6. DB Management: M.IrfanAsghar/Ahmed /Yasir/Ashiq 7. Procurement: Waqar Ahmed/IshtiaqHussain 8. Testing: Waqar Ahmed/M.IrfanAsghar/Taimoor/ Ashiq/ Yasir 9. Mechanics: IshtiaqHussain/Ismail/Ramzan/Sajjad 10. Logistics: IshtiaqHussain/Waqar Ahmed National Centre For Physics
Hafeez Hoorani Shamona Fawad Qazi Ishtiaq Hussain Waqar Ahmad Hassan Shahzad Sajjad Asghar Imran Malik Awan Saleh Muhammad Jamila Butt Irfan Asghar Ijaz Ahmad Muhammad Usman Muhmmad Taimoor Hamid Ali Ghulam Mujtaba Ashiq Ali Shahid Hussain Muhammad Arshid Muhammad Yasir Ali Muhammad Ismaeel Muhammad Ramzan Sajjad Bashir Man Power Physicists 4 Engineers 3 Computer Programmer 2 Students 5 Technicians 9 Total 23 National Centre For Physics
Tasks Performed National Centre For Physics
Cont.. National Centre For Physics
Pre-Assembly items and mechanics • Mr. Ishtiaq (Mechanical Engineer) Supervised the mechanics and Pre-Assembly items Preparation • Mr. Ismail (Fabricator) • Retrofitting of the honeycomb panel • Preparation of the Aluminum supporting bars National Centre For Physics
Cont.. • Mr. Furqan (Machinist) • Preparation of wider and narrow end patch panels • Mr. Ramzan (Technician) • Preparation and fixing of Mylar sheets at top inner side of HCP • Mr. Ghulam Mustafa (Welding Technician) • Preparation of the coolant plates for FEBs • Mr. Sajjad (Technician) • Cutting of Copper sheets and Mylar sheets National Centre For Physics
Pre-Assembly items and testing setups • Mr. Waqar (Electronic Engineer) Supervised Pre-Assembly items preparation and Testing setups • Mr. Yasir Ahmad (Technician) • Flat Cable preparation/ testing • Database Management • Front End Board Testing • Gas Gap Testing • RPC Testing Gas gaps testing setup National Centre For Physics
Cont.. • Mr. Ashiq Ali (Technician) • Copper Sheet preparation and soldering • Database management • RPC testing • FEB testing • Mr. Arshad Mehboob (Technician) • Gas pipe and blocker preparation • Adaptor board preparation and assembly Soldering at the copper sheet National Centre For Physics
Cont.. • Mr. ShahidHussian (Technician) • Co-axial Cable preparation • Gap testing • Sty cast filling (HV Connector) • Earthing and Assembly • Mr. Mujtaba (Technician) • Flat cable preparation and testing • Earthing cable preparation and assembly • Co-axial cable crimping • Mr. Muzammil (Technician) • Co-axial cable cutting • Brade cutting and stripping of cables Soldering at the adopter board National Centre For Physics
Final Assembly, Quality Assurance, Testing Ishtiaq / Waqar / Saleh / Imran / Hassan Two copper sheet pieces Readout strips sheet National Centre For Physics
Testing Lab National Centre For Physics
Installation • Installation of Endcap RPCs at CMS was done under the supervision of Mr. Ishtiaq Hussain • The persons with Cherry picker license are: • Mr. Ishtiaq • Mr. Hassan • Mr. Saleh • Mr. Taimoor Vertical RPC National Centre For Physics
Disk Completion 36 54 72 National Centre For Physics
Detector Control System • RPC Endcap DCS is working since August 2008 and is very helpful to operate and control the RE HV and LV system. • Mr. Hassan Shahzad and Mr. Taimoor Khurshid were involved in preparing RE DCS with the help of Giovanni Polese. National Centre For Physics
FEB Manufacturing at Pakistan • NCP is capable to produce cost effective FEBs for RPCs. • NCP produced FEBs which also passed the QA/real time tests at CERN hodoscope • The approximate cost for one FEB is 95 Euros • Also Capable to produce distribution boards in Pakistan.
NCP Can Offer • Manpower and Facilities • Free of cost - Assembly of RPCs - Making of Pre-Assembly items for RPCs • Cost effective production of RPC FEBs and DBs
Thanks National Centre For Physics