1 / 8

8 Steps to resurface your pool

"Planning to resurface your pool and looking for steps? Read this presentation with a step by step explanation. Contact us on https://www.jrpoolplastering.com/contact-us/<br>"<br>

Download Presentation

8 Steps to resurface your pool

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JR Pool Plastering & Texas Gunite Ltd.

  2. 8 steps to resurface your swimming pool • Drain • Prep • Tile and Masonry • Plumbing and Seal • Pool Finish Material Installation • Acid Wash • Clean up and Pool Fill • Initial Water Treatment/ Surface Curing

  3. 1) Drain:Drain your swimming pool and make sure to mark all the electrical wiring to avoid any accident 2) Prep: Generally the most dustiest step, our crew members will inspect for damaged area and willstart repairing it. We will additionally take care of all the furniture and fixtures and also of your backyard during the preparation

  4. 3) Tile and Masonry:The stage installing selected pool tile. Our craftsmen will install your selected tiles and every other details should be finalized in this step. It is a process of 1 to 3 working days on an average 4) Plumbing and seal: This is a stage where we will seal all the plumbing work in your swimming pool to ensure no leak is present during the pool resurfacing

  5. 5) Pool Finish Material Installation:This stage involves installation of pool surface and selected material. In this step, your pool finally starts to take a shape. Depends on the material seletctd, it may take up to 3 days 6) Acid Wash (optional): As per requirement, if the selected material requires acid wash then our highly trained and experienced team involves this step and performs in a safe manner

  6. 7) Clean-up and Fill Pool:After finishing all the steps, our team will clean up all the mess spread during pool resurfacing. After cleaning up, swimming pool will be filled till half mark to check for any leaks or maintenance 8) Initial Water Treatment: Our team will fill the swimming pool to its full mark and observe any missed out part during the resurfacing. This process generally gets followed till 7 days of regular inspection

  7. Our team at JR Pool Plastering and Texas Gunite is a professional company providing services like: • Excavation • Steel / Rebar • Gunite • Shotcrete • Tile and Coping • Plaster • Remodelling • Retaining walls • Erosion Control • Detention Ponds

  8. To Speak With Our Experienced StaffContact us