90 likes | 295 Views
High-rise Pack Loading. Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. At the half way point, drop down and begin the second tier. Female coupling should end up toward the brass holder side. Accordion fold half of hose complement.
E N D
High-rise Pack Loading • Place nozzle on hose and fold over about 4 to 6 inches past each end of pack.
Accordion fold half of hose complement. • Drop down and fold the balance. • Last section of hose is stacked with female coupling left out.
Velcro ring on end straps is placed at corner of pack • Belts are secured around pack. • Tails secure to Velcro around pack.
Velcro ring on end of straps is placed at corner of pack. • Strap is tensioned while holding thumb on strap and using buckle as a jack. • Pull strap tight and re-jack if necessary until desired tightness is achieved.
Securing the Gated-Wye • The Gated-wye can be pre-connected. • Secured by passing one of the black webs loops through the wye then through the other black web. • Anchor with the yellow web-Velcro.
The wye can be secured to the pack by itself. • Passing the black webs through the wye and then securing with the yellow web-Velcro. • To release, rip away the Velcro and pull the Wye loose.