1 / 9

Part 145 Work Performed Away From Fixed Location

Part 145 Work Performed Away From Fixed Location. Mobile Maintenance Units. GAMA AMP. Darcy D. Reed, AFS-340. February 21, 2014. Outline. Guidance Work away utilizing mobile maintenance units. Current Guidance. Revisions required to Order 8900.1.

takara
Download Presentation

Part 145 Work Performed Away From Fixed Location

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Part 145 Work Performed Away From Fixed Location Mobile Maintenance Units GAMA AMP Darcy D. Reed, AFS-340 February 21, 2014

  2. Outline Guidance Work away utilizing mobile maintenance units

  3. Current Guidance • Revisions required to Order 8900.1. • The term “temporary” and “continuous” are not defined • The requirement of “must” return to fixed location • Mobile Maintenance Units (MMU) oversight

  4. Clarification Needed • Temporary/Temporarily • FAA inspectors and repair stations interpret “temporary/temporarily” differently. • Current guidance does not define the terms.

  5. Clarification Needed • The requirement of “must” return to fixed location. • Differences between working away from fixed location for a special circumstance versus recurring basis. • Define work on a recurring basis

  6. Clarification Needed Mobile Maintenance Units Current FAA guidance points out that the use of “mobile maintenance units” and “mobile field services” are an acceptable means of a repair stations every day business practices.

  7. Clarification Needed • Oversight of Mobile Maintenance Units • Surveillance for work away • Continuous operations

  8. Policy Updates • Revised documents to address work performed away from fixed location and the use of mobile maintenance units. • Revised: • 8900.1 V2 Chapter 11 Section 1 • Advisory Circular 145-9 Guide for Developing and Evaluating Repair Station and Quality Control Manuals • New Advisory Circular for Work Performed Away From Fixed Location

More Related