1 / 9

K0 meeting

K0 meeting. 2007/11/22 Taito Kawasaki. 100 Pa. 1. Pabs correction. Pabs. DDM. DATE. needle valve. Pcor. Vacuum. Ne. needle valve open. preparing. work. press. stable. time. read pressure. all data. Pcor = 0.9881 ×P - 0.7980. collected data.

talib
Download Presentation

K0 meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. K0 meeting 2007/11/22 Taito Kawasaki

  2. 100 Pa 1. Pabs correction Pabs DDM DATE needle valve Pcor Vacuum Ne

  3. needle valve open preparing work press stable time read pressure

  4. all data Pcor = 0.9881 ×P - 0.7980 collected data

  5. Nov 2006 liquefaction ( with corrected P ) shift along Temperature vapor pressure curve

  6. Curve - TempC ? Can fit ? ? ? ①α × eβx + γ+δ fit by ②α x +β

  7. fitting result Nov06 Warming

  8. Not yet

  9. 2. Parameter check ohde Jan 2007 OHHL5 Runnum

More Related