1 / 4

Work on M1 LV during week 24

Work on M1 LV during week 24. Installed crate for the 4 Maraton AC/DC converter and the crate for the 4 RCM in rack B1A01 Connected the AC/DC converters and RCM crate to 220VAC and switched ON successfully

tallis
Download Presentation

Work on M1 LV during week 24

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work on M1 LV during week 24 • Installed crate for the 4 Maraton AC/DC converter and the crate for the 4 RCM in rack B1A01 • Connected the AC/DC converters and RCM crate to 220VAC and switched ON successfully • Installed the 4 Maraton to supply both FEE and ODE/SB crates in both access (T0A11) and cryo (T0A01) racks and connected to water cooling pipes • Tested successfully the individual LV lines (2.5V, 3.3V, 5.0V) on ODE/SB crates (without electronics) • Connected RCM to ethernet, and preliminary test with Michela to verify communication • On Friday Michela included successfully the M1 LV Power Supplies Control on the Muon PVSS project – this is the FIRST part of M1 included in the Muon control system !!! Alessandro

  2. What’s next on ODE side • Install ELMB boards on 12 ODE • Upgrade ODE firmware • Prepare and install CAN patch-cord from ODE to CAN Patch Panel in T0 and from PP to SYSTEC in the barrack • ODE-related work in T0 should be completed by Paolo by week 27 (4/7)!!! • Complete optical fibre installation in T0 and connection to Tell1 and Trigger in D3 • Communication (Bitr Error Rate) tests Alessandro

  3. Whats next on SB side • DCS cable connectorization is proceeding – 2 Rome1 technicians at work up to ~11 July. 5/36 SB • Cable testing after connectorization will not be done now • 4+4 CAN bus patch cord from PDM to PP to be installed in T0, probably next week • Some preliminary SB test involving (local) CANbus communication will probably be performed next week by Valerio Alessandro

  4. M1 Software needs • Some GEM + MWPC chambers will be installed before July 11th, and they will likely be in condition to operate • We need that people involved in ECS start thinking on how to include M1 in the Muon PVSS Project: still a lot of work to be done on: • FEE control • HV control • ... Alessandro

More Related