http://lcg.web.cern.ch/LCG/MB/availability/site_reliability.pdf. Reliability Reports –August 2007. CERN 99%. GridKa/FZK 67%. IN2P3 95%. RAL 99%. SARA-NIKHEF 86%. INFN/CNAF 70%. TRIUMF 97%. FNAL 99%. ASGC 83%. PIC 94%. BNL 71%. NDGF n/a. January 07 to August 07.

Download Presentation

Reliability Reports –August 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. http://lcg.web.cern.ch/LCG/MB/availability/site_reliability.pdfhttp://lcg.web.cern.ch/LCG/MB/availability/site_reliability.pdf Reliability Reports –August 2007

  2. CERN 99% GridKa/FZK 67% IN2P3 95% RAL 99% SARA-NIKHEF 86% INFN/CNAF 70% TRIUMF 97% FNAL 99% ASGC 83% PIC 94% BNL 71% NDGF n/a

  3. January 07 to August 07 • The target of 91% for the best 8 sites not reached • 6 Sites > 91% (target) (in July 7) • 6+2 Sites > 82% (90% of target) (in July 7+2) • * BNL: LCG/gLite CE probed by SAM but not installed with the SL4 upgrade

  4. Comparison with VO-Specific SAM Tests August 2007 Average 8 best sites: Aug 94% Jul 93% Jun:87% May 94% Apr 92% Average all sites: Aug 88% Jul 89% Jun:80% May 89% Apr 89%

  5. Comparison with VO-Specific SAM Tests September 2007 (until 24.9.2007/incomplete)

  6. Job Efficiency See JE_Summary In the Agenda