Recovering Galveston . With the Ike Dike and Galveston Promise as Example Projects. Bill Merrell Center for Texas Beaches and Shores Texas A& M University at Galveston. The Houston/Galveston Region.
E N D
Recovering Galveston With the Ike Dike and Galveston Promise as Example Projects Bill Merrell Center for Texas Beaches and Shores Texas A& M University at Galveston
The Houston/Galveston Region • Is home to about 2 Million people and may double by 2050 • Galveston Bay provides valuable ecosystem services and supports a vast petrochemical complex • Port of Houston alone generates over $117 Billion in economic activity annually • Is affected by a major storm about every 15 years • Evacuations are increasingly difficult for Hurricanes that quickly increase intensity and/or change direction
On Sept. 13, Ike passed over Galveston Island • Killing over 80 people • Causing $32 Billion dollars in damage • Damaging sensitive ecosystems and wildlife habitats • Devastating our most vulnerable (poor, elderly) populations much more than others Had it hit farther west (more towards San Luis Pass) its impacts would have been much more severe • Hundreds of lives lost • Many more billions in damages
Recovery Status • Individuals muddling through a confusing array of FEMA, SBA, Insurance, Mortgage Holder, etc. regulations • Banks, GEDP, helping with bridge loans • State, local governments trying to restore services and replace damaged infrastructure - seawall, sand socks, sewer plants, garbage pickup, etc. • If all goes well we might get back to the same vulnerable state were in when Ike hit • But, remember we have a major event about every 15 years, so
Recovery Strategies - 1 • It Would be Insane to Recover to the Same Vulnerable State (Fix) We Were In (But That’s Just What We’re Doing) • Need to Transform Galveston to a More Resilient and Less Vulnerable Place – Physically, Economically, Environmentally and Socially • This takes a Comprehensive, Community-based Approach • But the Community is also Busy Replacing Existing Infrastructure, much like Individuals
Recovery Strategies - 2 • So We Have 3 Processes – Individual and Community Replacement and Community Transforming • Often with Different Timing and Conflicting Goals • This is Why Recovery Plans Are Like Revenge – Best Served Up Cold • Real Time Recovery Planning (Our Present Mode) has a Strong Bias Toward Replacement and Against Change • (Ironically, the Comprehensive Plan Review Committee Recommended (in Draft) before Ike that Recovery and Mitigation Plans be Initiated)
The Ike Dike A Coastal Barrier Protecting the Houston/Galveston Region from Hurricane Storm Surge Center for Texas Beaches and Shores Texas A& M University at Galveston
To date, surge reduction strategies have been local: • Circling Dikes • Coastal Revetments • Hardening of Properties • Raising Individual Structures • But Each Approach has Limitations
A Better Strategy Protect the entire Houston/Galveston Region including Galveston Bay from hurricane surge using a coastal barrier (the Ike Dike) similar to the Dutch Delta Works
Components of the Ike Dike • Extension of the existing Galveston Seawall out to the West End (San Luis Pass) Covering a total distance of 18 miles • Addition of a seawall on Bolivar Peninsula from Bolivar roads to High Island Covering a total distance of 35 miles • Construction of inland “wrap-arounds” or extensions to the Dike at both ends • Construction of floodgates at Bolivar Roads, San Luis Pass, and on the Intracoastal Waterway
Proposed Galveston Bay Enclosure Bolivar Peninsula Galveston Island Bolivar Roads Existing Seawall Intracoastal Waterway San Luis Pass
The Dike protects all of GalvestonBay including ship channels
The Galveston Gates • Galveston gates will be the costliest component of the Ike Dike and its biggest tourist attraction • Must allow water circulation into the bay under normal conditions • But close quickly when a hurricane approaches to provide a 17ft higher-than-sea-level barrier across Bolivar Roads • Based on flood gates now operating near Rotterdam
Rotterdam Flood Gates protect a channel 1181 ft wide and 75 ft deep
Houston Ship Channel Specifications • main channel dredged to project depth of 45 feet and width of 530 feet; • 35-foot wide transition slopes on either side of the main channel, • measuring 45 feet deep at their innermost point, and 12 feet deep at their outermost point; • 200-foot wide barge lanes outside of the transition slopes, measuring 12 feet deep; and, • width of the entire channel is 1000 feet
When the gates have closed, they are flooded and drop down and seal the barrier.
Elsewhere - Can use other flood gate designs – Japanese example
RoughCosts • Seawall Extension:~$1,000,000,000 • Bolivar Roads Floodgate:~$ 1,000,000,000 • San Luis Pass Floodgate:~$ 50,000,000 • Intracoastal Floodgates:~$ 100,000,000 • Total Building Cost: ~$ 2,150,000,000 Additional costs will incur if purchase of land is required and there will always be inflation
The Ike Dike • Provides Comprehensive Regional Protection from Storm Surge • Protects Both Properties and Ecosystems • Helps Less Resilient Populations (Poor and Elderly) • Costs Much Less than a Single Hurricane Recovery • And We Face Recurring (15 yr Interval) Hurricanes • Protects Against Hurricanes that Quickly Change Path or Intensity • Is Less Costly and More Environmentally Sound than Armoring the Entire Bay System
The Galveston Promise For Any Long-Term GISD Graduate, We Will Pay Tuition and Required Fees at Any State College or University
Some Background Before Ike • We were Slowly Losing Population and GISD Enrollment • Our “Child-Raising Age” Population was Already Under-Represented After Ike • GISD Lost About 2000 Students • Galveston Lost Between 15,000 and 20,000 Residents • We Need to Actively Recruit Families • We Need to Raise Expectations of Students and Their Families
Galveston Promise • Based on Highly Successful Kalamazoo Promise • Proven to Attract Families, Increase Enrollment and Raise Student Expectations • Already have Galveston College’s Excellent Universal Access as a Base • Cost is About $1,000,000 Per Year
Center for Texas Beaches and Shores at http://www.tamug.edu/ctbs/
Truly Interconnected Downtown • Connect to Port • Connect to UTMB • Connect to East End Historic District • Deal with barriers – i.e. present structure of Harborside Drive, Port Railroad Tracks, Magnolia Homes • Create Connectors • Walking trails, Biking Trails • Bike racks, Places to Sit, Shade • Interconnected by Internet, Downtown Merchant Website